Type II Relationship:
In this relationship, any non-bottleneck resource (N) feeds work-in-process material (WIP) to a bottleneck (B) resource.
Legend B N
B Bottleneck resource, having slower processing rate, b
N Non bottleneck resource having faster processing rate; n (note, b < n)
Material flow
Figure: Type II Relationship
In these relationships, because of the difference between the supply rate of non-bottleneck (N) and bottleneck, inventory is piled up among the non-bottleneck and bottleneck resources.