Selection of Processing Sequence
A good manufacturing sequence is determined by selecting the suitable terminal points. Hence such a sequence must begin and end with part prints. Before formulating any process plan, the process engineer must find out what is wanted in the final product. At the end of manufacturing sequence, the process engineer must make reference to the part print to determine whether the final product meets all design specifications.