Production and Delivery:

The period between mixing and delivery should be kept to an absolute minimum by coordinating the delivery of concrete with its rate of placement. The temperature of aggregates, water and cement should be maintained at the lowest practical levels so that the temperature of concrete is below 40ºC at the time of placement. A suitable metal clad thermometer should be used to measure the temperature of concrete at the time of leaving the batching plant.