Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Junctions of the Wall and Floor
The junctions of walls and the floors need special attention to ensure effectual soil treatment. It is significant to establish vertical continuity of the poisoned soil barrier on inner wall surface up to top of consolidated earth filling within plinth. This is achieved through making 30 mm wide and 30 mm deep channels at the junction of walls and columns along with the earth filling in plinth. Holes are thereafter made in the channel at 150 mm apart up to ground level and then chemical emulsion is poured within the channel by the rate of 7.5 liters per square meter of the vertical column or wall surface. After the treatment the earth should be instantly tamped back within the holes and channel.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd