Maximising Equipment Effectiveness Assignment Help

Assignment Help: >> Overall Equipment Effectiveness (OEE) - Maximising Equipment Effectiveness

Maximising Equipment Effectiveness

The rate of equipment effectiveness is actually the operating rate or availability. We know that,

Availability = Operation time/ Loading time .

                  = (Loading time - Down time)/ Loading time

Here loading time is available time per day and is derived by subtracting planned down time from total available time per day. Planned down time is the official time scheduled in the production plan for maintenance activities. Thus if we can reduce this the numerator can be increased and thence the equipment effectiveness can be improved.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd