Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Method of Cross-section
Cross-sectional points are taken at regular interval in this method. The reduced level of all those points is established by levelling. The points are marked on the drawing sheets, their reduced levels (RL) are marked and contour lines interpolated. Given figure indicate a typical planning of this work. Spacing of cross-section based upon the nature of the ground, scale of the map & the contour interval needed. It varies in the range of 20 m to 100 m. if ground level varies abruptly Closer intervals are required. The cross- sectional line require not be always be at right angles to the main line. Ideally this method is suited for road and railway projects.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd