Cupola Operations Assignment Help

Assignment Help: >> Metals and Melting Practices - Cupola Operations

Cupola Operations:

Preparation of Cupola

The slag and refuse on the lining from the earlier run is eliminated and if essential the lining itself is repaired or remade. The bottom plates are swung to closing location and the prop inserted beneath them. Then the sand bottom is prepared along moulding sand such that it slopes towards the tap hole.

Firing the Cupola

The cupola is fired by kindling wood at the bottom. This must be done 2.5 to 3 hours before the molten metal is needed. On top of the kindled wood a bed of coke is made.  The height of this coke bed might vary from 50 cm to 125 cm according to the size of the cupola.

Charging the Cupola Pouring the Molten Iron
Soaking of Iron
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd