Excavation For Foundation
Site Clearance
Before the excavation for the proposed foundation is commenced then the site shall be cleared of brushwood, vegetation, stumps of trees etc. Roots of the trees shall be erased to at least 30 cm below the foundation stages. The pits created since of roots of trees, old foundations etc. should be filled up along with soil and compacted.