Operational Aspects of Activated Sludge Process Assignment Help

Assignment Help: >> Biological Treatment Of Wastewater - Operational Aspects of Activated Sludge Process

Operational Aspects of Activated Sludge Process

The main operational problem encountered in a system of this kind is sludge bulking that could be caused through the absence of phosphorus, nitrogen and trace elements and huge fluctuations in pH, temperature or dissolved oxygen (DO). Bulky sludge has poor compactibility and settleability because of the excessive growth of filamentous micro-organisms. This problem could be controlled through chlorination of the return sludge. Conventional activated-sludge processes and various modifications (Figures 13 to 15) are described below.

 

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd