Zones of smear around vertical drains, Civil Engineering

Assignment Help:

Zones of smear around vertical drains

Smear zones are produced during the installation of vertical drains in that zone of soils surrounding the band drains are disturbed. Soils in smear zones are remoulded at the time of installation process and effectiveness of band drains is decreased. For example, the compressibility of surrounding soils is increased and this brings the reduction of their permeability. Basically with the reduced permeability of soils around band drains, it takes longer time to complete consolidation process. 

To prevent the formation of smear zones, raising and lowering of mandrel during drain installation must be minimized. Furthermore soil disturbance can be controlled by avoiding use of vibratory hammers that serve to drive drains into the ground. 

1988_Zones of smear around vertical drains.png

Fig: Smear zones in band drain


Related Discussions:- Zones of smear around vertical drains

Compute the safe bearing capacity of a square footing, Compute the safe bea...

Compute the safe bearing capacity of a square footing 1.5 m × 1.5 m, located at a depth of 1 m below the ground level in a soil of average density 20 kN/m 3 .   = 20°, N c = 17.7,

State the design process of prestressed concrete, State the Design process ...

State the Design process of Prestressed Concrete Most of the times, the design process is an interactive and trial procedure in which the cycle of analysis - design - analysis

Determine the plastic limit of the soil, The liquid limit of a clay soil is...

The liquid limit of a clay soil is 56% and its plasticity index is 15%.  (a) Name the state of consistency is this material at a water content of 45% ? (b) Determine the plas

Vectors, how are vectors used in civil engineering

how are vectors used in civil engineering

How to find back bearings?, Example: The following fore bearings were ...

Example: The following fore bearings were observed respectively for lines, AB, BC, CD, DE, EF and FG. Find out their back bearings: (i) 148°                          (ii

Lintel, what is the classification of lintel

what is the classification of lintel

Calculate the total board feet, A project engineer has ordered 100 hardwood...

A project engineer has ordered 100 hardwood boards, 1-1/4-in thick by 8-in wide and 8-ft long.  The total board feet ordered is most nearly:  Solution: 1.25" x 8" x 8' x 100

Determine the example of tendon splices, Determine the example of tendon s...

Determine the example of tendon splices Following are some examples of  tendon splices. (a) Torpedo splice (b) Clamp splice (c)  Screw connectors

Mechanics of solids, if we take brass & steel and on applying temperature t...

if we take brass & steel and on applying temperature the brass contracts the steel expands how it is possible

Necessity of pile tip cover for rock-socketed H-piles, Q. Necessity of pile...

Q. Necessity of pile tip cover for rock-socketed H-piles? In current practice concrete cover is generally provided at the pile tips of pre-bored H-piles socketed in rock. The o

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd