Write short notes on bulking of sand, Civil Engineering

Assignment Help:

Q. Write short notes on Bulking of Sand?

Volume of sand fluctuates with variations in moisture content when sand is wet then each particle sets coating of water due to surface tension which keeps them apart thereby causing an increase in the volume to the sand . This increase in volume to the sand being wet is known as bulking of sand. Bulking increases gradually with the increase in moisture content. At 5% moisture content by weight and increase in volume is about 18 to 39%. It then decrease with the increase in moisture till it become zero when the water is more then 20%.


Related Discussions:- Write short notes on bulking of sand

Position of shear keys under retaining walls, Installation of shears keys a...

Installation of shears keys assists to increase sliding resistance of retaining walls without the necessity to widen the base. Effect of shears keys enhances the deepening of the s

An alternative test to confirm concrete strength, Question If concrete comp...

Question If concrete compression test not pass, So Schmidt hammer test will be adopted as an alternative test to confirm concrete strength ? Answer Schmidt hammer test is

Different type of stones, Different type of Stones Stones used for civi...

Different type of Stones Stones used for civil engineering works can be classified in the following 3 ways:    Geological    Physical    Chemical

Hydraulics, A rectangular channel, 20ft wide is shown. The channel consists...

A rectangular channel, 20ft wide is shown. The channel consists of three reaches of different slopes. The channel has a roughness coefficient of n=0.015 and carries a discharge of

Engeneering surveying, demonstrate your understanding of the term setting o...

demonstrate your understanding of the term setting out

Direction of approaching velocities of ships during berthing, Q. Direction ...

Q. Direction of approaching velocities of ships during berthing? One of the key effects of angle of approaching velocities of ships is its influence of energy to be absorbed by

Bond breaker for joint sealant, Joint sealant must be designed and construc...

Joint sealant must be designed and constructed to allow free extension and compression during the opening and closure of joints. In case joint sealants are attached to joint filler

Explain influence lines-reactions, Explain Influence lines-reactions 1....

Explain Influence lines-reactions 1.  Remove the support under investigation 2.  Displace the beam vertically a distance of 1 unit.  The resulting beam shape will be the sha

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd