Q. Write short notes on Bricks?
Bricks are an important construction material required in bulk Quantities for construction of walls both sub structure & super structure. For this good quality of clay shall be used & uniformly burnt in kilns. The maximum water absorption after 24 hours immersion in water shall be 20% for Ist class, 22% for IInd class & 25% for IIIrd class bricks. The maximum compressive strength shall be 35 kg/cm2 . Broken piece when examined shall not exhibit any lumps, voids etc. The test for uniform burning includes sound test of struck together or with any steel piece shall give a clear ringing sound. Brick when thrown from 1 meter height on ground shall not break or crack.
Soil Compaction: Soils used in road construction need to be thoroughly rolled and compacted. Compaction of soil is needed for the following reasons. (a) A well compacted s
A retaining wall with its face inclined at 75° with horizontal is 10 m high and retains soil inclined at a uniform surcharge angle of 10°. If the angle of internal friction of the
Solve problem of continuous beam with equilibrium equation
Explain the Hydraulic Radius (R) A fluid's cross-sectional area in flow divided by the wetted perimeter. For a circular channel flowing full and ½ full, R = D/4.
1. Draw the projections of a line AB that is 50 mm long and is parallel to both the HP and the VP. The line is 40 mm above the HP and 25 mm in front of the VP. 2. A line AB, 50 mm
Design of the stormwater drainage system for the sub-division Work needed: The following tasks require to be performed for the drainage network: Compute stormwater r
friction problems
Critical Path - Activity on Node The project precedence table shown below provides the relationships and durations of all activities. Based on end-of-day calculations for start
Preliminary settlement analysis for a building indicated a settlement of 50 mm in 4 years and an ultimate settlement of 250 mm. The average pressure increment in the clay stra
what are the names of differemt types of doors
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd