Q. Write short notes on Abrasion Test?

The abrasion test for ballast shall be carried out using Los-Angeles machine.The abrasive charge shall consist of 12 nos. cast iron or steel spheres approx. 48mm dia and each weighing between 390 and 445 gm ensuring total weight of charge as 5,000 ± 25 gm.

The test sample of 10000gm shall consist of clean ballast conforming to the following grading :- Passing 50mm and retained on 40 mm square mesh sieve 5,000 gm and Passing 40 mm and retained on 25mm square mesh sieve 5,000 gm tolerance of ± 2% permitted.

The sample shall be dried in oven at 100 - 110 °C to a constant weight and weighed (Weight 'A')

The test sample and the abrasive charge shall be placed in the Los-Angeles abrasion testing machine and the machine rotated at a speed of 20 - 33 revolutions/minute for 1000 revolutions. At the completion of test, the material shall be discharged and sieved through 1.70mm IS sieve.

The material coarser than 1.70 mm IS sieve shall be washed, dried in oven at 100-110°C to a constant weight and weighed (weight B).

The proportion of loss between Weight "A" and Weight "B" of the test sample shall be expressed as a percentage of the original weight of the test sample. This value shall be reported as: Aggregate Abrasion Value =((A-B)/A)X100.


Related Discussions:- Write short notes on abrasion test

Compaction to freshly placed concrete piles, Compaction to freshly placed c...

Compaction to freshly placed concrete piles  In general practice, reliance is placed on the self-compaction of particularly designed concrete mixes to achieve adequate compact

Choice of pavement - road pavements, Choice of Pavement: The advantag...

Choice of Pavement: The advantages and drawback of the two types of pavements are summarized in Table, to enable a choice to be made. Table : Advantages and drawback of

Design project, The completion of this assignment will entail the design of...

The completion of this assignment will entail the design of the structural fire protection for a simple warehouse building. You will provide a separate engineering calculation and

Explain damage inspections - underwater inspection of bridge, Explain the D...

Explain the Damage inspections - underwater inspection of bridge? Sometimes referred to as post-event inspections, damage inspections are typically unscheduled inspections aime

Calculate annual interest rate which is compounded monthly, You wish to buy...

You wish to buy a house and you can afford to make a down payment of $50,000. Your monthly mortgage payment cannot exceed $2,000. If 30-year loans are available at 7.5% annual inte

Turbines, application of turbines 2 the civil engineering aspect

application of turbines 2 the civil engineering aspect

Describe the terms inside clearance and outside clearance, a) Explain with ...

a) Explain with a neat sketch how will you carry out the wash boring method of soil exploration. What are its merits and demerits? b) Describe the terms 'inside clearance' and '

What is material at site return, Q. What is Material at site Return? Th...

Q. What is Material at site Return? The authority is executive charge of a work should be responsible for holding in safe custody for controlling the consumption and to the ext

GNS 201, explain registers and factors influencing them

explain registers and factors influencing them

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd