Write short note on stock verification, Civil Engineering

Assignment Help:

Q. Write short note on Stock Verification?

It is desirable that there should be a frequent reconciliation of the balances as shown in the numerical ledgers kept by the subordinates with the actual quantities hand. The Executive engineer should there fore arrange that approximately one sixth of the stock under each subordinate is verified by actual count each month so that the whole district or divisional stock is verified at least once every six months. The verification is in addition to the stock verification made by Accounts stock verifiers. All discrepancies should be enquired into. discrepancies if small i.e. not amounting in value to more than Rs 100 may after the executive Engineer has satisfied him self by investigation that no irregularity has occurred be adjusted to final heads under his orders. If the amount involved exceeds this amount the matter should be reported to the higher authorities for orders.


Related Discussions:- Write short note on stock verification

#tile.., Material for formwork and their specifications

Material for formwork and their specifications

Explain about the pre-tensioning systems, Pre-tensioning systems In the...

Pre-tensioning systems In the previous unit we have seen different steps in a pretensioning operation. Tendon wires or strands (formed as a rope type arrangement made of  sever

Design nominal reinforcement to piles, Question Is it true that there i...

Question Is it true that there is no essential to design nominal reinforcement to piles. Answer In BS8110 and BS5400 Pt.4, they need provision of nominal reinforce

Bending stress in beams, can you give me example of bending equestion stres...

can you give me example of bending equestion stress as numerical?

Fore bearing, find out the interior angleS with diagrame LINE AB, BC, CD, D...

find out the interior angleS with diagrame LINE AB, BC, CD, DE, EA Fore bearing 60''30" , 122'' , 46'' , 205''30" , 300''

Numericals on settlement of foundation, A footing foundation for a water to...

A footing foundation for a water tower carries a load of 9000 kN and is 3.6 metres square. It rests on dense sand of 9 m thickness overlying a clay layer of 3 metres depth. The cla

Surveying, Describe the two fundamental purpose of surveying.

Describe the two fundamental purpose of surveying.

Scale., how many scale are there and what are they use

how many scale are there and what are they use

Dams, The regulations and specifications that followed for compaction works...

The regulations and specifications that followed for compaction works for earth dam in Oman

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd