Write short note on stock verification, Civil Engineering

Assignment Help:

Q. Write short note on Stock Verification?

It is desirable that there should be a frequent reconciliation of the balances as shown in the numerical ledgers kept by the subordinates with the actual quantities hand. The Executive engineer should there fore arrange that approximately one sixth of the stock under each subordinate is verified by actual count each month so that the whole district or divisional stock is verified at least once every six months. The verification is in addition to the stock verification made by Accounts stock verifiers. All discrepancies should be enquired into. discrepancies if small i.e. not amounting in value to more than Rs 100 may after the executive Engineer has satisfied him self by investigation that no irregularity has occurred be adjusted to final heads under his orders. If the amount involved exceeds this amount the matter should be reported to the higher authorities for orders.


Related Discussions:- Write short note on stock verification

What do you mean by distressing, Q. What do you mean by Distressing? Di...

Q. What do you mean by Distressing? Distressing is the operation under taken with or with out rail tensors to secure stress free condition in the LWR at a desired rail temperat

How to calculate the total loss of prestress, How to calculate the total lo...

How to calculate the total loss of prestress As a general guide, it may be taken that total loss of prestress may be in the range of 20 to 25 percent of the initial prestress,

Bituminous macadam, What is the working capacity of a road paver per hour f...

What is the working capacity of a road paver per hour for bituminous macadam

Need Answer, EXPLAIN THE STRUCTURE OF EXOGENEOUS TREE WITH DIAGRAM ?

EXPLAIN THE STRUCTURE OF EXOGENEOUS TREE WITH DIAGRAM ?

Working from whole to part in survey, a clear illustration about working to...

a clear illustration about working to part principle and some examples

What are the conditions essential for darcy law, What are the conditions es...

What are the conditions essential for Darcy's law to be applicable for flow of water by soil ? Why is the permeability of a clay soil with flocculated structure greater than tha

Force system, show the diagram for non coplanar non concurrent force system...

show the diagram for non coplanar non concurrent force system

Geo Technical Project, I have a geo technical Project that I need to be sol...

I have a geo technical Project that I need to be solved correctly and accurately within 15 hours exact, please. Steps and details must be included. Thanks a lot and let me know ASA

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd