Write short note on skv process of thermit welding, Civil Engineering

Assignment Help:

Q. Write short note on SKV  process of thermit welding?

This term is used for welding by Alumino thermic process with short preheat time. The time required for preheat with petrol and air is only 10 minutes. The principal merit of SKV process is that, time required for preheat is reduced from 30-45 minutes for ordinary thermit welding to only 10 minutes, there by reducing the block time requirements and ensuring a better quality of preheat. The process will employ prefabricated moulds, there by ensuring a better quality of weld collar.


Related Discussions:- Write short note on skv process of thermit welding

Acsr aluminium conductor steel reinforced are utilized as , Q. ACSR (Alumi...

Q. ACSR (Aluminium Conductor Steel Reinforced) are utilized as (A) over head transmission lines.            (B) super conductors. (C) fuse

Moisture content, What is moisture content for road work

What is moisture content for road work

Hydrometer analysis - soil mechanics and foundations, Hydrometer Analysis -...

Hydrometer Analysis - soil mechanics and foundations Hydrometer Analysis used to obtain the grain size distribution of fine-grained soils (finer sands, silts and clays) smalle

Choosing between trailer suction hopper and grab dredgers, Question In ...

Question In search reclamation, what are considerations in choosing between trailer suction hopper dredgers and grab dredgers ? Answer Trailer suction hopper dred

Determine the magnitude of application of the active thrust, A retaining wa...

A retaining wall 9 m high retains cohesion less soil, with an angle of internal friction 33°. The surface is level with the top of the wall. The unit weight of the top 3 m of the f

Stacking of materials for building, briefly explain the stacking of materia...

briefly explain the stacking of materials in the site for general building?

Concrete, What practical steps can one take to mitigate the adverse effects...

What practical steps can one take to mitigate the adverse effects in using aggregates with higher than specified flakiness index in the production of concrete

Railway bridge, how to measure the waterways of railway bridges

how to measure the waterways of railway bridges

Construction water, what should we do if alkalinity in water is greater tha...

what should we do if alkalinity in water is greater than 25

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd