Write definition of afflux and skew bridge, Civil Engineering

Assignment Help:

Write definition of the following -

(i) Afflux. ( ii ) Free Board. ( iii ) Clearance. ( iv ) Via duct. ( v ) Skew Bridge ( vi ) Cause Way. ( vii ) Clear Span. ( viii ) Effective span. ( ix ) Over all Span ( x ) Score. ( xi ) Water Way.

Ans.- Afflux - It is the rise in the flood level of the river up stream of the bridge as a result of obstruction to natural flow caused by the construction of the bridge.

Free Board - This is the vertical distance between the high flood level inclusive of afflux and the formation level.

Clearance - This is the vertical distance between the high flood level inclusive of afflux and the bottom most part of bridge super structure like slab girder etc.

Via duct - When the bridge is constructed to cross a valley for railway instead of filling it the bridge as called via duct.

Skew Bridge - When the bridge is not right angle to the axis of river or other such opening it is called a skew bridge.

Cause Way - It is a bridge constructed to pass a flood water over the railway track is called cause way.

Clear Span - It is the clear distance between any two bridge supports like abutments piers etc. Effective span - It is the distance between centers of two adjacent bridge supports.

Over all Span - It is the over all length of girder.

Score - It is the rise in the distance from rail level and bottom of rivers.

Water Way - The area of the opening of a bridge blow super structure through which water flows is called water way.


Related Discussions:- Write definition of afflux and skew bridge

Pros and cons of a variety of non-destructive weld methods, Question In...

Question In checking quality of weld, what are pros and cons of a variety of non-destructive weld inspection methods as in ultrasonic test, radiographic inspection and magnetic

Surveying, length of the line measured with 20m chain found to be 250m.calc...

length of the line measured with 20m chain found to be 250m.calculate true length if the chain was 10cm long

Strength of Materials, Describe the process of yielding and state the effec...

Describe the process of yielding and state the effect work hardening has on the yield point of mild steel using suitable sketches where appropriate.

Kings of the world, i want to know more about civil engineering

i want to know more about civil engineering

Design approach for the spacing of min-piles, Design approach for the spaci...

Design approach for the spacing of min-piles For close spacing of min-piles, it would provide substantial cost savings with reduction of pile cap size. Though close spacing of

Conditions of pumping performance, Question In conditions of pumping pe...

Question In conditions of pumping performance, how have to engineers determined use of radial flow pumps and axial flow pumps ? Answer Exact speed is usually define

Convert reduced bearings into whole circle bearings, Example: Convert t...

Example: Convert the following reduced bearings into whole circle bearings: (i) N 65° E                           (ii) S 43° 15′ E (iii) S 52° 30′ W           (iv)

Dam, tupes of dam

tupes of dam

Dam details, how to prepare a project of final year

how to prepare a project of final year

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd