Work Measurement:
Work measurement goes hand in with method design. Whereas the method design are directed towards the study of the components of a single or multiple operation of a system. It is a technique by which the actual time consumed in performing an operation is computed and ultimately serves as suitable time standard. It is the study of work content of a job so s to lay down a fair days work. It seeks provide a quantitative assessment of the human work in a specified job and to establish the proper time for the effective performance of that job.
Work measurement has been defined as the application of techniques designed to determine the time required by or defined level of performance to do a specified job. The time is called standard or allowed time.
According to British Standard Institution " The application of techniques to establish the time for a qualified worker to carry out a specified job at a defined level of performance"
Qualified worker is a representative average of those workers. Who are fully trained and able satisfactorily to perform any and all phases of work involved, in accordance with the requirement of the job under consideration?
Normal pace is the effective rate of performance of conscientious self paced qualified worker when working neither fast slow and giving due considerations to physical mental or visual requirement of the specific job. Specific job is in the best possible method of a job under consideration.
This case study will be discussed and reviewed in the Case Study discussion question for the week. Post your responses to the questions at the end in the Case Study discussion ques
Explain levels of management. Levels of Management: Industrial management has got the given activity levels: 1) Top Management : this includes Board of Directors, Ma
Explain work breakdown structure. Why do resource constraints affect project results?
Cost management processes are involved in estimating, budgeting and controlling costs so that the project can be completed within the approved budget.
Question 1: Describe the main growth strategies that a firm can pursue and discuss conditions that favour each strategic option. Support your answer with suitable examples.
advantages and disadvantages of product-oriented layout
What are the problems that Walmart has faced and what has the company done to address
You are the plant manager at Acme Plastics. You are running two shifts, a day shift and an evening shift. Before the day shift leaves each day, the workers must get an adequate sup
Taking the topic you discussed in the other thread to start, explain how you would morph the traditional training you described, taking into account a technology-based training. De
Question: (a) With reference to examples you are familiar with, explain the terms dependent demand and independent demand. (b) Materials requirement planning is a techniq
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd