Q. Why we use cold working?

Cold working takes place below the recrystallization temperature, and therefore is fundamentally different at the atomic level with effects up to the macroscopic level.

Advantages of Cold Working

• No heating required.

• Close dimensional tolerances possible.

• Surface finishes are better.

• Strength, hardness, and directional properties are improved.

Disadvantages of Cold Working

• Produces stresses that sometimes have to be removed by heat treating.

• Higher forces and heavier equipment needed.

• Metal must be clean and scale free.


Related Discussions:- Why we use cold working

Determine the maximum torque - shaft, Determine the maximum torque - shaft:...

Determine the maximum torque - shaft: Determine the maximum torque that can be safely transmitted by a shaft of 400 mm diameter, if (a) the maximum allowable shear stress i

Cad - requirements for standard interface, Requirements for Standard Interf...

Requirements for Standard Interface  The interface must be capable of handling all kinds of manufacturing data. There should be no information loss when data is transf

Explain working of steam sampling, Q. Explain working of Steam Sampling? ...

Q. Explain working of Steam Sampling? Sample coolers shall be supplied by the Vendor. A common sample spillage trough shall also be provided by the Vendor, with a cover screen

Perform a beam modal analysis, 1) Figure shows a thin Aluminium structural ...

1) Figure shows a thin Aluminium structural beam use in an aircraft structure.  Using the stiffness method, determine the BM and Shear force of the two elements of the thin beam sh

Types of polymerisation, Types Of Polymerisation When some of bifunctio...

Types Of Polymerisation When some of bifunctional molecules connect in a chain structure, the reaction is termed as addition polymerisation.  However, these polymerizations do

Inspection and testing for coating application, Q. Inspection and testing f...

Q. Inspection and testing for coating application? The Applicator shall perform all inspection and testing necessary to assure that the surface preparation and coating applicat

Show the design of the control rooms, Q. Show the design of the control roo...

Q. Show the design of the control rooms? The design of the control rooms in any plant is very important. The control room operator(s) must be able to control and manage safety

Explain the statement- subsidence of the ground, Explain the statement- su...

Explain the statement- subsidence of  the ground Another type of problem is the subsidence of  the ground due to breakdown of weak rocks like  limestone, soluble rocks (gypsum

Boiler, parameters specified in a steam boiler

parameters specified in a steam boiler

Water turbine, what are the types of water turbine and its application ?

what are the types of water turbine and its application ?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd