Why we need a high strength concrete in prestressing, Civil Engineering

Assignment Help:

Why we need a high strength concrete in prestressing

There is another aspect to why we need a high strength concrete in prestressing. Prestressed concrete is subjected to high values of compressive, tensile. shear. bond and bearing stresses. In the case of post-tensioned concrete. anchorages occupy a little cross-sectional area of concrete at the ends. Through these small areas, the prestressing force of a high magnitude is transferred to the concrete member. If the strength of concrete is not adequate, the anchorages may locally damage the end portion of concrete member and may punch inside concrete. If this happens, a major portion of tendon stresses may get lost.


Related Discussions:- Why we need a high strength concrete in prestressing

Planning stage of the audit, Materiality is used only at the planning stage...

Materiality is used only at the planning stage of the audit. Ans: I disagree with the statement because: When planning the audit, the auditor considers what would make the fi

Streams not wholly alluvial - alluvial streams, Streams Not Wholly Alluvial...

Streams Not Wholly Alluvial In streams which are not wholly alluvial, consisting of bed of pebbles, rock, etc. the liner waterway is kept equal to the actual surface width of

Cost of utilities and taxes, The cost of utilities, taxes and maintenance o...

The cost of utilities, taxes and maintenance on a home is $3,000 per year.  The amount of money that would have to be invested now at 8% to cover these expenses for the next 5 year

Som, derive the expression for stress in arbitrary plane in a body subjecte...

derive the expression for stress in arbitrary plane in a body subjected to bi axial stress condition

Explain the mechanism of compaction by paver, Q. Explain the Mechanism of c...

Q. Explain the Mechanism of compaction by paver? Mechanism of compaction by paver, steel-wheeled roller and pneumatic tire rollers Paver, steel-wheeled roller and pneumat

Compute the ultimate settlement, A 2 m wide strip footing is to be constru...

A 2 m wide strip footing is to be constructed in a sandy stratum of 2 m thick. The depth of the footing is 1 m below ground surface. The sand layer is underlain by lm thick cla

Softening test point, the importance of softening point of a bitumen materi...

the importance of softening point of a bitumen material in the design of a pavement

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd