Question

In modeling a nonrigid mat foundation by using elastic springs, have a uniform modulus of subgrade reaction be used along whole base of mat?


Answer

A bed of springs to simulate flexible behaviour of mat subject to loads, care must be engaged in collection of modulus of subgrade reaction. In fact, modulus of subgrade reaction depends on factors like width of the mat, shape of the mat, depth of founding level of mat etc. In particular, modulus of subgrade reaction is smaller at center even as it is larger near mat's edges. If constant modulus of subgrade reaction is adopted throughout width of mat, then a more or less uniform settlement will effect while subject to a uniform load. Yet, actual behaviour is that settlement in the center is higher than that at side edges. So, it directs to an underestimation of bending moment by 18 to 25 percent.


In broad, a constant value of modulus of subgrade reaction is in general applied for arrangement with a rigid superstructure and rigid foundation. Yet, a variable modulus of subgrade reaction is adopted in its place for non-rigid superstructure and non-dominance of foundation rigidity to explanation for effect of force bulbs.

 

 


Related Discussions:- Whole base of mat

Timber, defects in timber?

defects in timber?

Calculate the parameters for setting out curve, Q For a curve of 50, apex ...

Q For a curve of 50, apex angle of 900 and transition length of 60m, calculate the parameters for setting out curve by a Theodolite for TTP, mid point of transition, CTP and a p

Depth of boring for multi-storeyed building, Depth of Boring  for Multi-st...

Depth of Boring  for Multi-storeyed Building Peck has recommended that first drill hole is to be made up to depth at which the presence of a thick layer of soft clay with a hig

Show the benefits of adopting marine fill, In reclamation involving large v...

In reclamation involving large volumes of fill and tight programme, shall engineers use marine fill or mud extracted from land borrow area as filling material?  There are two

Define chlorides - underwater inspection of bridge, Define Chlorides - unde...

Define Chlorides - underwater inspection of bridge? Chlorides do not attack plain concrete when present in the concentrations that normally exist in seawater, but may greatly a

Explain some important points for hazardous waste, Explain some Important P...

Explain some Important Points for Hazardous Waste The mixture rule prevents dilution of waste for the purposes of escaping RCRA regulation. Mixtures of a listed hazardous w

Reasons of using compressed air as drilling fluid, Q. Reasons of using comp...

Q. Reasons of using compressed air as drilling fluid? For rotary drilling in ground investigation works, drilling fluid is generally used to clear and clean the cuttings from t

Stress, stress and there types

stress and there types

Cost-volume-profit and break even analysis, Cost-Volume-Profit and Break Ev...

Cost-Volume-Profit and Break Even Analysis: Cost-volume-profit analysis helps us to learn the behaviour of cost and profit in response to varying level of business activity. I

Hoyers long line system pre-tensioning, Hoyers long line system pre-tension...

Hoyers long line system pre-tensioning When concrete attains the required strength,  jacks  are released and tendon wires in-between various units are cut.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd