Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
What is write-back or copy-back protocol?
For a write operation using this protocol during write-hit: the method is to update only the cache and to mark it as updated with an associated flag bit, often called the modified or dirty bit. The main memory location of the word is updated later, when the block having this marked word is to be removed from the cache to make room for a latest block.
For a write-miss: the block having the addressed word is first brought into the cache, and then the deserved word in the cache is overwritten with the latest information.
Determine about the Radio Frequency (RFID) This method includes using small electronic devices containing an Identification microchip and antenna; they work in a similar way
What is Process? Process: A process is a program in execution. It is an active entity, represented through the value of the program counter and the contents of registers o
If the input to T-flipflop is 100 Hz signal, the final output of the three T-flipflops in cascade is ? Ans. The final output of the three T-flip-flops in cascade is 12.5 H
Stencil Duplicating Equipment Required Stencil Duplicator Thermal copier (optional) Electronic stencil cutter Materials Stencil COPY paper Ink Clean
Multithreading is the process in which more than single thread run independent of each other within the process in any programming language such as C, C++, etc.
Enumerate about the trackball A trackball is a two-dimensional positioning device, a spaceball provides six degrees of freedom. Unlike the trackball, a spaceball does not actua
design modulo 12 up synchronous counter using t flip flop
What happens if the both source and destination are named the same? Ans) The import operation present in MS Access does not overwrite or change any of the existing tables or obj
What is LoadRunner
Elements are given 3,14,7,1,8,5,11,17,,6,23,12,20,26,4,16,18,24,25,19 We will construct b tree and avl tree And after that delete some integers
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd