What is the cost of phoenix activity, Civil Engineering

Assignment Help:

Q. What is the cost of phoenix activity?

Phoenix activity has a range of impacts on the Australian economy. Employees lose entitlements when phoenix activity has occurred and will often not be paid superannuation; businesses won't have goods and services they have paid for provided or will have debts left outstanding; and government revenue is impacted by phoenix companies not paying tax debts.

A key challenge for this project was quantifying these impacts of phoenix activity. Particular focus was given to quantifying the impact on the industrial relations system and on employees. There is currently a significant lack of data collection on phoenix activity. On the basis of the available data and a series of assumptions that were tested with stakeholders, the total impact of phoenix activity has been estimated to be $1.78 - $3.19 billion per annum.


Related Discussions:- What is the cost of phoenix activity

Define superposition method, Define Superposition Method  1. Remove eno...

Define Superposition Method  1. Remove enough redundant supports to reduce the structure to a statically determinate condition 2. Calculate the deflections at the previous l

Define compression - actions in pot bearings, Define Compression - Actions ...

Define Compression - Actions in POT Bearings? Vertical load is carried through the piston of the bearing and it is resisted by the elastomeric pad. Elastomer is incompressible,

Theories of failure - cases of solids, Theories of Failure - cases of solid...

Theories of Failure - cases of solids: Let us now consider the solid shown in Figure (b). (a)        As the principal stresses are within 260 MPa, the solid is safe ac

What is diversion tunnel in a dam, When a dam is to be built, a diversion t...

When a dam is to be built, a diversion tunnel is usually bored by solid rock next to the dam site to bypass the dam construction site. The dam is built while the river flows by the

Chain survey, Instruments used in chain survey

Instruments used in chain survey

Constructed wetland design guidelines, Develop a simple urban constructed w...

Develop a simple urban constructed wetland design guidelines and drawings. Your report should include the following: I. Data required for the design II. Types of constructed

Fly levelling, we are given a project on field.i''d like to know about how...

we are given a project on field.i''d like to know about how to start n proceed vd fly levelling in the field

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd