What is rail lubricators, Civil Engineering

Assignment Help:

Q. What is Rail Lubricators?

1. P & M type of lubricators - These lubricators can be used for lubrication of FF rails as well as BH rails.

2. Elgi grease pump - Elgi Bucket type grease pump with attachment for lubrication of rails. The whole equipment is molded on a trolley.

Technical details of the equipment are as follow -

i. Model - Single cylinder portable static drum type with cover.

ii. Pressure - 2000 PSI.

iii. Drum Capacity - 25 Kg.

iv. Average speed of trolley while greasing 5 to 7 KmPH.

v. Simultaneous lubrication on both rails by one pump operated by one man.

vi. Fixed on trolley by suitable clamp.


Related Discussions:- What is rail lubricators

Explain the createthread function used in the windows nt, Explain the Creat...

Explain the CreateThread Function used in the Windows NT CreateThread(security, size, MyThreadFunction, arg, flag,&tID ) The CreateThread function call is used to start an i

Define fatigue load test of shock transmission unit, Define Fatigue load te...

Define Fatigue load test of shock transmission unit? This test was carried out for 100,000 cycles for maximum capacity of STU, assuming the worst case that the 'Lock Up Load' i

Define the impact damage - underwater inspection of bridge, Define the Impa...

Define the Impact Damage - underwater inspection of bridge? Impact from moving vessels or logs carried during the floods can inflict damage to the structure. The impact or coll

Explain the statements about construction contract process, Explain the Sta...

Explain the Statements about the Construction Contract Process I. Surety bond assures the project owner a guarantee of funds equivalent to a promissory note. The surety bond is

IRC class 70R, What will be the structural weight per meter for IRC class 7...

What will be the structural weight per meter for IRC class 70r bridge

LEVELLING, WHAT IS FLYBBACK LEVELLING

WHAT IS FLYBBACK LEVELLING

Total volume of soil that excavated from the borrow area, Project specifica...

Project specifications require a relative compaction of 95% (modified Proctor).  Construction of a highway embankment requires 10,000-yd 3 of fill.  The borrow soil has an in-situ

Comparing speed, Question Comparing speed of "Formwork exceeding 300mm wide...

Question Comparing speed of "Formwork exceeding 300mm wide, horizontal and at any inclination up to and including 5o to horizontal" with speed of "Formwork exceeding 300mm wide, at

State the term - total loss of prestress, Total loss of prestress The ...

Total loss of prestress The total amount of losses of prestresses may be accounted for in a prestressed concrete member by adding different losses which may take place for tha

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd