What is preset mean while installation of bridge bearings, Civil Engineering

Assignment Help:

What is preset mean while installation of bridge bearings?


Related Discussions:- What is preset mean while installation of bridge bearings

TIMBER PILE, ADVANTAGE AND DISADVANTAGE OF TIMBER PILE

ADVANTAGE AND DISADVANTAGE OF TIMBER PILE

Hydraulics, A rectangular channel, 20ft wide is shown. The channel consists...

A rectangular channel, 20ft wide is shown. The channel consists of three reaches of different slopes. The channel has a roughness coefficient of n=0.015 and carries a discharge of

Engineering mechanics, Characteristics of couple #Minimum 150 words accepte...

Characteristics of couple #Minimum 150 words accepted#

What is objective method of assessment, Q. What is objective method of asse...

Q. What is objective method of assessment? Track recording consists of objective method of assessment of the quality of track with the help of sophisticated equipments. A conti

Continuous flow systems, Continuous Flow Systems: Transport by road, r...

Continuous Flow Systems: Transport by road, rail, air or ships takes place in vehicles which move along a path at intervals. As against this, continuous flow systems are those

Explain situations that warrant a damage inspection, Explain Situations tha...

Explain Situations that warrant a damage inspection? - Floods - bridges located in streams, rivers and other waterways with known or suspected scour potential. - Build-up of

How do you measure concrete, We can measure concrete by Cubic feet, Cubic y...

We can measure concrete by Cubic feet, Cubic yards, Cubic Meter

Define pressure on an inclined plane, Define Pressure on an Inclined Plane ...

Define Pressure on an Inclined Plane Similar to a vertical plane, fluid pressure increases linearly with increasing depth. The average pressure on an inclined plane occurs at t

Concrete, what is the heat of hydration and gel space ratio?

what is the heat of hydration and gel space ratio?

Rubber dams – air-filled vs water-filled, Most of the existing rubber dams ...

Most of the existing rubber dams are of air-filled types. Water-filled rubber dams aren't preferred for the below reasons: (i)  By giving same sheet length and dam height, tensi

12/5/2013 6:28:56 AM

Preset is a way to reduce size of upper plates of sliding bearings in direct to save material rate. The normal length of an upper bearing plate must be composed of following works:


Length of bearing + 2 x irreversible movement + 2 x reversible movement. Firstly bearing is placed at a mid-point of an upper bearing plate without considering any directional effect of permanent movement. However, irreversible movement normally takes place at one direction only, bearing is represented a distance of (irreversible movement/2) from a mid-point of bearing in which length of upper plate length is the same to length of bearing + irreversible movement + 2 x reversible movement. In this plan, size of upper plate is minimized in which irreversible movement receives place in one direction only and there is no requirement to include component of two irreversible movements in an upper plate.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd