Q. What is Over vibration of fresh concrete?

For proper compaction of concrete by immersion vibrators, vibrating part of the vibrators must be completely inserted into the concrete. The action of compaction is enhanced by providing a sufficient head of concrete above the vibrating part of vibrators. This serves to push down and subject the fresh concrete to confinement within the zone of vibrating action. 

Over-vibration must generally be avoided at the time of the compaction of concrete. If concrete mix is designed with low workability,over-vibration basically consumes extra power of vibration andleads to wastage of energy. For most of concrete mixes, over-vibration causes the problem of segregation in that denser aggregates settle to the bottom whereas the lighter cement paste is likely to move upwards. If concrete structure is cast by successive lifts of concrete pour, upper weaker layer (or laitance) caused by segregation forms potential plane of weakness resulting in possible failure of concrete structure during operation. If concrete is located in a single lift for road works, resistance to abrasion is poor for laitance surface of the carriageway. This becomes a serious problem to concrete carriageway where its surface is constantly subject to tearing and traction forces exerted by vehicular traffic.


Related Discussions:- What is over vibration of fresh concrete

Explain standard penetration test used in soil exploration, Explain the "St...

Explain the "Standard Penetration Test" used in soil exploration. List the information that can be obtained by the test when made in (a) clay, (b) sand. Comment on the correctio

Work, Grouted or Penetration Macadam:

Grouted or Penetration Macadam:

Important parts of road pavements, Important parts of road pavements: ...

Important parts of road pavements: Prime Coat : Application of a low viscosity bituminous binder over a granular base to fill up the voids. Tack Coat : Application of b

Doors, what is door and window sizes

what is door and window sizes

Timber, what are the defects in timber

what are the defects in timber

Measure the stress increment, A raft of size 4 m × 4 m carries a uniform lo...

A raft of size 4 m × 4 m carries a uniform load of 200 kN/m 2 . Using the point load approximation with four equivalent point loads, measure the stress increment at a point in the

Mechanics, What is the parallelogram law of force and prove it?

What is the parallelogram law of force and prove it?

Define the pre-tensioned concrete construction, Define the pre-tensioned co...

Define the pre-tensioned concrete construction We understand that in the pre-tensioned concrete construction, stretched tendons are provided in the concrete moulds at the time

Quantitative Influence Line, Solve the following three questions of the bea...

Solve the following three questions of the beam ABCD. Note that A is a fixed end; B is apin connection; C is a roller support; and D is a free end. 1) Sketch the quantitative

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd