Question
After construction of watermain, earlier to hydrostatic pressure test, swabbing is approved out. What is main purpose of swabbing?
Answer
Pipelines have to be tested before commissioning to check strength of watermain and absence of leak. Sooner than carrying out hydrostatic pressure test, swabbing is conducted to clear out refuse and dirt left inside pipeline during construction. Swabbing is necessary for pipes less than 600mm diameter since for larger size of pipes; they can be inspected on the inside to ensure cleanliness. Following carrying out of hydrostatic pressure test, test for water sterilization is next conducted that involves collecting water sample from pipeline. Purpose is to check water quality like colour, turbidity, odor, pH value, conductivity. This is compared with superiority of water drawn from water provide point.
Improvements to Public Bus Transport: Since buses carry a large number of passengers, improvements in bus transport is a cheap solution. Some of the possible improvements are
Water Transportation: Water transport, in its various forms, is one of the most efficient forms of transport, because of low fuel consumption, low environmental pollution and
Absolute pressure is simply the addition of the observed gage pressure plus the value of the local atmospheric pressure.
Question Can all utility detectors detect depth of utilities ? Answer In Hong Kong, underground utility detectors are as a rule separated into two categories- electro
cross section diagram of urban roan in embankment,in cut,in eight lane,in conjusted area,divided hihgway
Define Drag load test of shock transmission unit? This test ensures that excessive load should not be transmitted to the structure by the STU. As per the test the STU shall hav
Sir, What is the dosage limit of densifier for SFRC concrete
How do we get electricity even when the gates of a dam were closed?
Q. Show the Differences Between GGBS and PFA? The use of GGBS as substitute of cement improves smaller reliance on PFA. Particularly GGBS is supposed to be more compatible with
solving problems with their answer
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd