Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Q. What is Imp rest Stores?
Material obtained not for specific works but as a standing advance for the purpose of material urgent requirements as and when they arise should with the exception of consumable stores such as cotton waste, jute, oil and grease be treated as imp rest stores so long as they are under the control of the authority in charge of the executive unit. All such stores should be borne on an emprest account to be maintained by the departmental subordinate in charge of the stores and this form part of the stores and this form part of the stores balances of the railway.
The imprest with every subordinate should be fixed by the head of the department. The scale of imprest sanctioned for each subordinate should not be increased or decreased except by the authority who originally fixed the scale.
Material issued from in present stock should be recouped as soon after the issues as possible. The subordinate concerned may place requisitions for the recoupment of imprest stores direct on the authorized stores Depot.
No transfer of stores between imprest holders should be permitted except when stores are immediately required in a particular area in an emergency and are not available at the time with the imprest holder of that area. In such exceptional cases the stores required may be obtained from a neighbouring imprest holder who will then charge them off to the final head in his own account.
write short notes about force systems and equilibrium
Define Chemical Deterioration - Underwater inspection of Bridge? Chemical deterioration may occur in concrete, which has not been properly compacted, or through environmental p
define scale and sludge and mention the scale and sludge forming substance and explain the prevention methods
Q. How to evaluate quality of Bricks? 1. Clour -Deep red, Carry red, Copper red, colour is indication of uniform burning and also suggests quality of clay used. Over brunt bric
Define the Fatigue failure - underwater inspection of bridge? Fatigue failure results in the fracture of structural members as a consequence of repeated high loading. Fatigue
Ductility Test: The ductility of a bituminous binder is its ability to deform under load and return to its original condition after removal of the load. The property is deter
what is the physical meaning of damping?
In reclamation involving large volumes of fill and tight programme, shall engineers use marine fill or mud extracted from land borrow area as filling material? There are two
a pilot entering a bay on course
Find the maximum stress: A circular bar rigidly fixed at both ends is 1 m long and tapers uniformly from 20 cm diameter at one end to 10 cm diameter at the other end. Find the
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd