Q. What is Imp rest Stores?

Material obtained not for specific works but as a standing advance for the purpose of material urgent requirements as and when they arise should with the exception of consumable stores such as cotton waste, jute, oil and grease be treated as imp rest stores so long as they are under the control of the authority in charge of the executive unit. All such stores should be borne on an emprest account to be maintained by the departmental subordinate in charge of the stores and this form part of the stores and this form part of the stores balances of the railway.

The imprest with every subordinate should be fixed by the head of the department. The scale of imprest sanctioned for each subordinate should not be increased or decreased except by the authority who originally fixed the scale.

Material issued from in present stock should be recouped as soon after the issues as possible. The subordinate concerned may place requisitions for the recoupment of imprest stores direct on the authorized stores Depot.

No transfer of stores between imprest holders should be permitted except when stores are immediately required in a particular area in an emergency and are not available at the time with the imprest holder of that area. In such exceptional cases the stores required may be obtained from a neighbouring imprest holder who will then charge them off to the final head in his own account.


Related Discussions:- What is imp rest stores

Stochastic calculus, Consider a market with one stock and one money market ...

Consider a market with one stock and one money market account, with the same assumptions on parameters (such as r, µ and s 2 ) as in the derivation of the Black-Scholes formula giv

Determine the equivalent of free float, The free float is equal to: a. L...

The free float is equal to: a. Latest allowable event occurrence time + Early finish time b. Earliest event occurrence time + early finish time c. Latest allowable event o

Rolling - binder, Rolling - Binder: The layer thickness is 40-50 mm. R...

Rolling - Binder: The layer thickness is 40-50 mm. Rolling is done in three stages : Initial Rolling By 80-100 kN smooth wheeled roller. Intermediate Rolling B

What is imp rest stores, Q. What is Imp rest Stores? Material obtained ...

Q. What is Imp rest Stores? Material obtained not for specific works but as a standing advance for the purpose of material urgent requirements as and when they arise should wit

Paint, painting wood work

painting wood work

Failure analysis in designing of a structure, Modes of failure • For sa...

Modes of failure • For safe design, a knowledge of the possible modes of failure is also necessary, e.g. failure of the structure could occur due to - Tensile fracture due t

Finding the Point of Contraflexure, Hi, I am struggling with some beam desi...

Hi, I am struggling with some beam design, I need to find the bending moment of a continuous beam. It has 3 supports, each end is pinned and the middle support is off centre and fi

Construct the correct network for project, A project requires that activiti...

A project requires that activities A and B can be started independently and activities C and D are independent but can be started after A and B have been completed. Activity E can

Vectors, applications of vectors

applications of vectors

Diving operation - preparation for underwater inspection, Define Diving Ope...

Define Diving Operation - Preparation for underwater inspection? Use of experienced divers trained and screened by a reputed commercial diving school is critical for successful

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd