Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Q. What is Coating Thickness?
The dry thickness of the coating shall be checked by using a "micro test" magnetic gauge or approved equal which has been properly calibrated, at least once per eight hour shift, to the approximate thickness of the coating. A minimum of five (5) measurements, randomly distributed along the length of each joint of pipe, shall be made with notation of the minimum, maximum and predominant thickness measured.
#queConsider laminar flow in a circular tubewith a fully developed velocity profile.Let the heat be added at a constant rate along the tube from x+ =0 to x+ =0.10 . Thereafter ,
show that energy is property of system
A plane wall (thermal conductivity = 10.2 w/m o c) of 100 mm thickness and area 3m 2 has steady surface temperature of 170 o c and 100 o c. Evaluate :- (i) The temperature
Example of Alteration of Position and Reference Line Method: Sketch the projections of a pentagonal prism edge of the base 50 millimeter long and height 90 millimeter, the axi
Draw complete shear and moment diagrams for a 3 m long cantilever beam having a uniform distributed load of 2 kN/m along its length.
Thin wall tube has diameter of 60mm. The end of it will be compressed to square form. Calculate how many percents torsion strength will becomne lower at the end of tube?
Extension of auger in the main auger arrangement The original size of screw conveyer without auger extension is 2.5 m., which is same as size of chassis. Which to be attach wit
Clutch cable model: Ensure the cables fitted are of the respective model and not interchanged with other model. Also ensure that the cable is genuine.
Compaction This is carried out in several manners that might occupy the addition of a binder or lubricant and application of pressure. Sintering is densification of assembled
Tunnels: Tunnels become unavoidable for negotiating hills, where detours are costly. The tunnels in rock are not lined, but those in loose strata require a lining of cement c
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd