What is a feasibility study, Civil Engineering

Assignment Help:

In order to make wise investments in a marketplace experiencing enhancing levels of risk, companies are turning to feasibility studies to verify if they should offer new products, services or undertake a new business endeavour. The purpose of a feasibility study is to verify if a business opportunity is possible, practical, and viable. When faced with a business opportunity, many optimistic people tend to focus on just the positive aspects.

A feasibility study enables a realistic view at both the positive and negative aspects of the opportunity. A feasibility study is a significant tool for making the right decisions. A wrong decision often leads to business failure. For example, only 50% of start-ups are still in business after 18 months and only 20% are in business after 5 years.

 


Related Discussions:- What is a feasibility study

Use of stone aggregates in road construction, Use of Stone Aggregates in Ro...

Use of Stone Aggregates in Road Construction Stone aggregates are extensively used in roads in pavement layers. They are obtained from natural rock. The following geological

Insurance required to be incorporated in deal, Question Is procurement ...

Question Is procurement of third party insurance required to be incorporated in deal for construction works? Answer Purpose of third party insurance is to guard contra

Natural rubber and synthetic rubber, Q. Natural rubber and Synthetic rubber...

Q. Natural rubber and Synthetic rubber? There is often a confusion between the words elastomer and neoprene. While elastomer refers to the generic name of the rubber, neoprene

Determine the elastic settlement of a rectangular foundation, Determine the...

Determine the elastic settlement of a rectangular foundation, 6 m × 12 m, on a uniform sand with E = 20,000 kN/m 2 and Poisson's ratio,   = 0.2. The contact pressure is 200 kN/m 2

Fluid mechanism, tell me something about velocity profile?

tell me something about velocity profile?

Hydrographic data for design of bridge, Q.What Hydrographic data required f...

Q.What Hydrographic data required for Design of bridge? (i) Design discharge for bridge waterway and foundation with corresponding high flood levels. Frequency curve for annual

Time to remove formwork to cater for early thermal movement, Q. Time to rem...

Q. Time to remove formwork to cater for early thermal movement? Let's take a circular column as an illustration to explain effect of internal restraint to thick sections.  W

Explain the clearance interval - signalized intersections, Explain the Clea...

Explain the Clearance Interval - Signalized Intersections  Also known as "Red Clearance Interval" and "All Red"        r = (w+L) / V - If there is no pedestrian traffic r

Introduction to engineering mechanics, Deternim the angle A for which the m...

Deternim the angle A for which the moment of the 500N force is maximum about a point o. also find the maximum momentum

PROJECT PROPOSAL, HOW CAN I INVESTIGATE THE PROPERTIES UNBURNT COMPRESSED C...

HOW CAN I INVESTIGATE THE PROPERTIES UNBURNT COMPRESSED CLAY BRICKS AND STABILIZED UNBURNT COMPRESSED BRICKS.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd