In order to make wise investments in a marketplace experiencing enhancing levels of risk, companies are turning to feasibility studies to verify if they should offer new products, services or undertake a new business endeavour. The purpose of a feasibility study is to verify if a business opportunity is possible, practical, and viable. When faced with a business opportunity, many optimistic people tend to focus on just the positive aspects.
A feasibility study enables a realistic view at both the positive and negative aspects of the opportunity. A feasibility study is a significant tool for making the right decisions. A wrong decision often leads to business failure. For example, only 50% of start-ups are still in business after 18 months and only 20% are in business after 5 years.
difference between RCC and RBC
Retardation of fresh concrete has numerous benefits as below: (i) A rapid hydration process leads to loss in concrete strength since concrete will have a poorer structure with
Pavement of evaluation
Define Dual frequency and colour fathometer - Sounding/Sensing Devices? Dual Frequency and Colour Fathometers can be used to detect refill in the scoured area since more than o
what is the manufacturing process of regular portland cement
Pre-tensioned concrete elements It is the act of transferring the stress in prestressing tendons to the concrete member. In the case of pre-tensioned concrete elements, this st
A raft of size 4 m × 4 m carries a uniform load of 200 kN/m 2 . Using the point load approximation with four equivalent point loads, measure the stress increment at a point in the
A project requires that activities A and B can be started independently and activities C and D are independent but can be started after A and B have been completed. Activity E can
Q. What do you mean by Laying of apron in design of bridge? Width of apron laid on river bed should be 1.5 D1 where D 1 is estimated scour depth in metres below river bed. Thi
A retaining wall 9 m high retains granular fill weighing 18 kN/m 3 with level surface. The active thrust on the wall is 180 kN per metre length of the wall. The height of the wall
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd