What is a feasibility study, Civil Engineering

Assignment Help:

In order to make wise investments in a marketplace experiencing enhancing levels of risk, companies are turning to feasibility studies to verify if they should offer new products, services or undertake a new business endeavour. The purpose of a feasibility study is to verify if a business opportunity is possible, practical, and viable. When faced with a business opportunity, many optimistic people tend to focus on just the positive aspects.

A feasibility study enables a realistic view at both the positive and negative aspects of the opportunity. A feasibility study is a significant tool for making the right decisions. A wrong decision often leads to business failure. For example, only 50% of start-ups are still in business after 18 months and only 20% are in business after 5 years.

 


Related Discussions:- What is a feasibility study

Steps to determine hydraulic horsepower for pump problems, Steps to determi...

Steps to determine the hydraulic horsepower (whp) for pump problems:  1) Determine (h A ) by rearranging the Bernoulli equation.    2) Apply (h A ) into the equation found i

What are aquifers - hydraulics system, What are Aquifers? Water bearing...

What are Aquifers? Water bearing, underground geologic formations. The subsurface formations are composed of soils and rocks with voids saturated with water.

Diver qualification - diving operation for bridge inspection, Define Diver ...

Define Diver Qualification - Diving Operation for Bridge Inspection? The requisite qualification for divers and diving supervisors are given in IS 10291 -1982, which stipulates

Show the process of waterproofing for bridge decks, Q. Show the process of ...

Q. Show the process of Waterproofing for bridge decks? Waterproofing materials such as membranes are applied on top of bridge deck surface since:  (i)  Vehicular traffic (f

Determine the flow velocity, Determine the flow velocity in 2,000 ft of 8 i...

Determine the flow velocity in 2,000 ft of 8 inch diameter piping flowing full. The energy lost in piping is 54 ft. Use nominal pipe diameter and C = 140.     Solution: Use v =

Define hand tools for underwater inspection of bridge, Define Hand Tools fo...

Define Hand Tools for Underwater Inspection of Bridge? Hand tools involve scrapers, wire brushes, chain and wire ropes. Tools of this kind are suited in which cleaning is confi

Define unit hydrograph - hydrology, Define Unit Hydrograph UNIT HYDROGR...

Define Unit Hydrograph UNIT HYDROGRAPH: The hydrograph developed for a drainage basin (watershed) from the runoff of a 1 in or 1 cm storm. It is the base hydrograph from which

Reduced levelling, what is the theary of reduced levelling

what is the theary of reduced levelling

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd