Q. What do you mean by Stock Verification Sheets?

The proper custody and accountal of stores is the prime duty and function of an executive or the stockholder. To ensure this verification of stock is done either departmentally or by the Accounts stock verifier. The stock verification sheets are prepared giving the numerical balances of items as in the ledgers and actual stock. The verification between ledger balances and actual stock are clearly brought out. The verifier and the stockholder jointly sign these sheets.

One copy of the sheet is kept with the stock verifier and three copies are handed over to the stockholder. The stock holder is required to offer his explanation for variation and recon cite the discrepancies and submit the sheets in duplicate to the divisional office for scrutiny and acceptance. These sheets are then forwarded by divisional office along with their remark to the Accounts.

Clearance of out standing S.V. Sheets is closely watched by the department and also by accounts. At the time of handing over charge the stock holder is required to clear the out standing S.V. Sheets for any reason the same should be recorded in the handing over notes by the stock holder.


Related Discussions:- What do you mean by stock verification sheets

What is diversion tunnel in a dam, When a dam is to be built, a diversion t...

When a dam is to be built, a diversion tunnel is usually bored by solid rock next to the dam site to bypass the dam construction site. The dam is built while the river flows by the

Levelling, important terms used in levelling

important terms used in levelling

Define the term - cracking load and proof stress, Define the term - Crackin...

Define the term - Cracking Load and Proof Stress Cracking Load The load on the structural member at the time of the initiation of first visible crack in concrete is know

Light and rapid rail transit, Light Rail Transit (LRT) Light Rail Tra...

Light Rail Transit (LRT) Light Rail Transit is also known by the name train. LRT can be run on the surface if road space is available (as in Kolkata) or as elevated, with pil

Project management, Project Management: This unit starts with the gene...

Project Management: This unit starts with the general definition of Project management. Several phases involved in project management are also desribed. Further, the technique

Determine the steps for routine inspection, Determine the Steps for routine...

Determine the Steps for routine inspection? A routine inspection should normally include: - A Level I inspection on 100% of the underwater portion of the structure to determ

Verify the total active thrust on the wall per lineal metre, A smooth backe...

A smooth backed vertical wall is 6.3 m high and retains a soil with a bulk unit weight of 18 kN/m 3 and φ = 18°. The top of the soil is level with the top of the wall and is horiz

Damp proofing, how to remove dampness in mud houses?

how to remove dampness in mud houses?

Estimate the activity durations - construction management, Estimate the Act...

Estimate the Activity Durations The total labor cost for emergency bridge rehabilitation on an interstate highway is $5,716,440.  The average crew-hour cost is $15,879 for this

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd