Q. What do you mean by Manhole loss?
Manholes are provided in locations where there are changes in direction, size and gradient of gravity pipelines. Generally practice for straight pipelines manholes have to be installed at a certain spacing to facilitate the maintenance of pipes. With the introduction of manholes, there are numerous reasons that account for the manhole loss:
(i) Sudden expansion of inflow into manholes and sudden contraction of flow out of manholes lead to major energy losses.
(ii) It isn't uncommon that numerous pipes may be connected to the same manhole. The intermixing of flow takes place inside the manhole and this results in head losses.
(iii)Flow inside the manholes can be designed to change directions that contribute to further losses.
Q. What is Rail Lubrication? Rail Lubrication is done on sharp curves where lateral wear is considerable. The function of Rail Lubrication is to lubricate or oil the running fa
im newer to the courses so i would like to know about the assignment types. in this case can u please show me a sample assignment?
1. Can you enumerate the benefits of individual wall method of estimation? 2. Estimate the single room of size 3m x 4m x height 3m using individual wall method? 3. Which met
what are advantages and disadvantages of barometric levelling
Design of prestressed concrete pipes The design of prestressed concrete pipes should cover the following five stages : (a) Circumferential prestressing, winding with or wit
DOES A GAUGE BOX OF THE SIZE LIKE 50,40,30 MM EXISTS?
Explain the Non Destructive Inspection Steel/Cast Iron Substructures Some of the structural defects in steel structures may not be visible during visual inspection. In that eve
a) Certain data for the materials used in the construction of the building, e,g, insulation, building materials, air spaces, etc. b) Draw, with appropriate dimensions, the cro
Aalumsk question #Minimum 100 words accepted#
Topographical Survey and Preparation of Drawings: Topographical Survey for a road project consists of three sequential stages: (a) Reconnaissance Survey, including a study
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd