What do you mean by guide bunds, Civil Engineering

Assignment Help:

Q. What do you mean by Guide bunds?

Guide bund may be given an elliptical shape separation of flow can be avoided better with such an alignment. Alternatively straight parallel guide bunds can also be adopted if preferable on account of any reasons. Straight parallel guide bunds may be provided with heads of sufficiently flat curvature or of composite curve, to avoid separation of flow from the guide bund head and shank.

In case of submontane rivers and when there are site constraints, deviation from elliptical shape may be warranted. Guide bunds shapes conforming to channel configuration and site conditions with wide splay and along length may then be necessary.


Related Discussions:- What do you mean by guide bunds

Conventional incineration and refuse-derived fuel facilities, Explain the C...

Explain the Conventional Incineration and Refuse-Derived Fuel Facilities? 1. Conventional (Mass-Fired) Incineration most common form of municipal solid waste (MSW) incin

#title.METALS., WHAT IS THE DIFFERENCE BETWEEN FERROUS AND NON FERROUS META...

WHAT IS THE DIFFERENCE BETWEEN FERROUS AND NON FERROUS METALS

Timber, seasoning of timber

seasoning of timber

Non uniform flow in open channe, A rectangular channel is 3 m in width and ...

A rectangular channel is 3 m in width and draws water from a lake. The channel slope is 0.001 and the Manning’s n is 0.0013. What will be the discharge in the channel when the lake

Fluid mechanics, Cd of venturimeter is more than that of orificemeter

Cd of venturimeter is more than that of orificemeter

Corner reinforcement for concrete pavement, Q. Corner reinforcement for con...

Q. Corner reinforcement for concrete pavement? Let's consider a panel of concrete slab without any load transferring devices at it edges. When concrete panel is subjected to tr

Design of the aeration basin based on solids retention time, Design of the ...

Design of the Aeration Basin Based on Solids Retention Time - sewer construction: You are provided the following information about a municipal wastewater treatment plant. That

Determine the project duration and critical path, Critical Path - Activity ...

Critical Path - Activity on Node The project precedence table shown below provides the relationships and durations of all activities. Based on end-of-day calculations for start

I.s. codes on earthquake resistant building design, I.S. CODES ON EARTHQUAK...

I.S. CODES ON EARTHQUAKE RESISTANT BUILDING DESIGN Bureau of Indian Standard has divided the country into five zones depending upon the severity of earthquake after observing

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd