What do you mean by guide bunds, Civil Engineering

Assignment Help:

Q. What do you mean by Guide bunds?

Guide bund may be given an elliptical shape separation of flow can be avoided better with such an alignment. Alternatively straight parallel guide bunds can also be adopted if preferable on account of any reasons. Straight parallel guide bunds may be provided with heads of sufficiently flat curvature or of composite curve, to avoid separation of flow from the guide bund head and shank.

In case of submontane rivers and when there are site constraints, deviation from elliptical shape may be warranted. Guide bunds shapes conforming to channel configuration and site conditions with wide splay and along length may then be necessary.


Related Discussions:- What do you mean by guide bunds

Strength of materials, Didtribution of shear stree over a triangular sectio...

Didtribution of shear stree over a triangular section

Building, individual wall methods benefits?

individual wall methods benefits?

Explain the term - moderate prestressing, Explain the term - Moderate Prest...

Explain the term - Moderate Prestressing In this form of prestressing, no limit is imposed on  the magnitude of tensile stresses which may be produced in a concrete member unde

State the volume change from the plastic limit, The plastic limit and liqui...

The plastic limit and liquid limit of a soil are 33% and 45% respectively. The percentage volume change from the liquid limit to the dry state is 36% of the dry volume. Likewise, t

High strength friction grip bolts and normal bolts, High strength friction ...

High strength friction grip (HSFG) bolts vs. normal bolts HSFG bolts have the following benefits when compared with normal bolts: (i)  Performance of preloaded HSFG bolts u

Calculate the parameters for setting out curve, Q For a curve of 50, apex ...

Q For a curve of 50, apex angle of 900 and transition length of 60m, calculate the parameters for setting out curve by a Theodolite for TTP, mid point of transition, CTP and a p

Calculate the amount of cubic yards of soil, A proposed building site requi...

A proposed building site requires 135,000-ft 3 of imported fill.  A borrow site is located 5-miles Northeast of the project site where the soil has a shrinkage of 16%.  The amount

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd