What do you mean by guide bunds, Civil Engineering

Assignment Help:

Q. What do you mean by Guide bunds?

Guide bund may be given an elliptical shape separation of flow can be avoided better with such an alignment. Alternatively straight parallel guide bunds can also be adopted if preferable on account of any reasons. Straight parallel guide bunds may be provided with heads of sufficiently flat curvature or of composite curve, to avoid separation of flow from the guide bund head and shank.

In case of submontane rivers and when there are site constraints, deviation from elliptical shape may be warranted. Guide bunds shapes conforming to channel configuration and site conditions with wide splay and along length may then be necessary.


Related Discussions:- What do you mean by guide bunds

Planning of water transport facilities, Planning of Water Transport Facilit...

Planning of Water Transport Facilities: Definition of Terms In water transport system, a number of terms are used. It is necessary for a civil engineer to know the pr

Explain plate loading test, Q. Explain Plate loading test? In general i...

Q. Explain Plate loading test? In general iron plates either 60 cm squares or 75 cm dia and 16 mm thick are used, size of plate should not be less then 1/5th of the width of f

High and narrow beams, Question Give a reason that why are high and na...

Question Give a reason that why are high and narrow beams not desirable in concrete piers? Answer Supported on past experience in other, high and narrow beams after

Finding the Point of Contraflexure, Hi, I am struggling with some beam desi...

Hi, I am struggling with some beam design, I need to find the bending moment of a continuous beam. It has 3 supports, each end is pinned and the middle support is off centre and fi

Rcc, how many rcc is use for 1 brass?

how many rcc is use for 1 brass?

Surveying, what are obstacles in chaining

what are obstacles in chaining

Total volume of soil that excavated from the borrow area, Project specifica...

Project specifications require a relative compaction of 95% (modified Proctor).  Construction of a highway embankment requires 10,000-yd 3 of fill.  The borrow soil has an in-situ

What is the required bracing location for the beam, A contractor has select...

A contractor has selected a W14x74 simply supported beam for a high rise construction project.  The span length for the provided beam is set at 30 feet.  The maximum factored appli

Environmental engineering, A nearly horizontal, 12 ft wide rectangular chan...

A nearly horizontal, 12 ft wide rectangular channel carries 60 cfs at a depth of 3.0 ft. The width of the channel is smoothly contracted to 6 ft at the downstream section. (a) Dete

Pavement Drainage, What would be the best way to evaluate the field perform...

What would be the best way to evaluate the field performance benefits of subsurface drainage in a flexible pavement? Short term and long term, thick or thin HMA..

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd