Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
What are the Rules for making DFD
The below factors must be considered when making DFDs:
1. Keep a note of all processes and external entities. Give unique names to them.
Identify the manner in which they interact with one another.
2. Do numbering of processes.
3. Avoid complex DFDs (if possible).
4. The DFD must be internally consistent.
5. Each process must have minimum of one input and one output.
Data store must contain all the data elements which flow as output and input.
What are the elements of design model? i. Data design ii. Architectural design iii. Interface design iv. Component-level design
difference between implicit and explicit conceptual model
Give explanation about the incremental model. - Have same phases as the waterfall model. - Phases are as follows: Analysis. Code. Design. Test. Incre
Write the Importance of standards. Encapsulation of best practice- avoids repetition of past mistakes. They are a framework for quality assurance processes - they include ch
Explain in detail about the real time systems. Hard and soft real time systems. Real time and high performance. Real-Time control. Real time software design
differentiate between structured analysis and structured design
Q. Compare CMM with ISO 9001 ? 1: Management responsibility: ISO 9001 needs that the quality policy be defined and documented and understood as well implemented and maintaine
Write down the SRC for "Add a node" Function Add node Description Adds a node to an existing design. Inputs Node type, Design Identifier, Node position Source
1) The relationship between characters or groups of characters independent of their meanings or the manner of their interpretation and use; 2) The formation of expressions in a
a) Define Annual Change Traffic (ACT) and Annual Maintenance Effort (AME) of Boehm model. b) For a software system of 90 KLOC, 5KLOC of code was added. The initial development
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd