What are rules for working of dip lorries, Civil Engineering

Assignment Help:

Q. What are rules for working of Dip lorries and their protection arrangements on a single line section explain with sketches?

Ans.-Rules for working of Dip lorries -

i. Subject to their being certificate comp lent the all inspectors of engineering and signal and tele communication departments are permitted to us Dip lorri.

ii. No Railway servant shall use a lorry unless he is in a possession of a permit.

iii. The permit will only be issued after examined and valid for a period of one year.

iv. Each Lorry must have marked on it the number designation and code initials of the HQ.

v. Whenever lorry be placed on P.F. for loading on a train it should be placed paralleld to the Track.

vi. Lorry shall always be pushed and not pulled.

vii. When ever a lorry has to work within station section the PWI will advise the station master in writing.

viii. A lorry may be worked with out block protection when the PWI before putting a lorry on the line has as certained from the station master on duty.

ix. When the PWI intents to place the lorry on the line in mid section he shall issue a message on field telephone to the Station Master.


Related Discussions:- What are rules for working of dip lorries

Bitumen tests, discussion of each bitumen test, its significance and import...

discussion of each bitumen test, its significance and importance in understanding and working with bitumen

Chemical prestressing, advantages and disadvantages of chemical prestressin...

advantages and disadvantages of chemical prestressing over conventional prestressing?

Concrete cracking, Attached information shows construction details of a wat...

Attached information shows construction details of a water tank. The slab was poured in one pour and the walls (incl. Baffles) were poured in two even sections. Forms were stripped

Non-distortional prestressing, Non-distortional Prestressing Concrete m...

Non-distortional Prestressing Concrete members deflect due to their own self weight. If prestressing force is applied in such a way that these deflections are eliminated due to

What is moisture-dry density, Describe why soils are compacted in the field...

Describe why soils are compacted in the field. How is the degree of compaction ensured in the field (i.e., control of field compaction)? Distinguish among 'compaction' and 'consoli

Designing of roadbase material, Question In General Specification for C...

Question In General Specification for Civil Engineering Works, designing of roadbase material is based on recipe approach. Give reason. Answer Designing of roadbase

What are some facts about concrete, Actually, drying is not directly linked...

Actually, drying is not directly linked to hardness in concrete. After concrete is poured, putting it in a wet environment by spraying it constantly with water will hasten its hard

Consideration of hazards in design, • Gas turbines produce noise, heat radi...

• Gas turbines produce noise, heat radiation and exhaust gas emissions that are potentially a danger to health • Fuel is flammable and there are hot surfacesand moving parts

Obstacle measurement.., ..describe how u can obtain the length of an inacce...

..describe how u can obtain the length of an inacceble length of a land when a river cross it

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd