Q. What are rules for working of Dip lorries and their protection arrangements on a single line section explain with sketches?
Ans.-Rules for working of Dip lorries -
i. Subject to their being certificate comp lent the all inspectors of engineering and signal and tele communication departments are permitted to us Dip lorri.
ii. No Railway servant shall use a lorry unless he is in a possession of a permit.
iii. The permit will only be issued after examined and valid for a period of one year.
iv. Each Lorry must have marked on it the number designation and code initials of the HQ.
v. Whenever lorry be placed on P.F. for loading on a train it should be placed paralleld to the Track.
vi. Lorry shall always be pushed and not pulled.
vii. When ever a lorry has to work within station section the PWI will advise the station master in writing.
viii. A lorry may be worked with out block protection when the PWI before putting a lorry on the line has as certained from the station master on duty.
ix. When the PWI intents to place the lorry on the line in mid section he shall issue a message on field telephone to the Station Master.
Particle Size Distribution (Gradation): The particle size distribution is determined by passing the aggregates through a set of standard IS sieves (Figure) and determining th
Q. Underwater problems in bridge construction? The major bridge construction materials are steel and concrete. In the past, stone and brick masonry, with lime mortar as binding
Q. Afflux in rivers with non scourable bed? Afflux is defined as rise of flood level of the river upstream of a bridge as a result of the obstruction to natural flow caused by
Q. Permanent Repairs to rail fracture? (i) If the fracture is such that, wide gap A T welding ban be adopted, then the total length of fractured ends to-be cut shall be equal t
I need urgent support in my assignment and also my UU triaxial lab report. thanks Maryam
mixing ratio of different type of ready mix concrete.(RMC)
Classification Based on Availability: Forest departments categorized timbers based on the availability as X=Most common. 1415 m 3 or more per year Y=Common. 355 m 3 to 1415
calculate height of instrument?
Non-carbonate hardness (NCH) - Water Softening 1. Permanent Hardness, not removed by heating water 2. Ca +2 , Mg +2 combining with ions outside of alkalinity such as Cl -1
Define the Cost of shock transmission unit? There is a keen competition among the few STU manufacturers. For the second Bassein Creek Bridge, the average cost of two STUs of ca
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd