What are different severity ratings in a project?

There can be 4 types of severity ratings in a table:

i.) Severity 1 - Showstoppers - Don't allow application to move at all.

ii.) Severity 2 - Application continues with severe defects - Application works with these defects that might have severe implications.

iii.) Severity 3 - Application works with unexpected outputs

iv.) Severity 4 - Suggestions - These are improvements suggested in application. They don't affect performance of the application.

 


Related Discussions:- What are different severity ratings in a project

What is a boundary value analysis, What is a boundary value analysis? A...

What is a boundary value analysis? A boundary value analysis is a testing method in which the elements at the edge of the domain are selected and tested. It is a test case desi

What is compatibility testing, What is Compatibility testing - It's a n...

What is Compatibility testing - It's a non-functional test performed on a software system or component for checking its compatibility with the other parts in computing environm

What is the work product of software design process, What is the work produ...

What is the work product of software design process and who does this? A design model that encompasses architectural, interface, component level and their representations is th

Explain document interchange standards, Document interchange standards ...

Document interchange standards Interchange standards permit electronic documents to be exchanged mailed, etc.  Documents are produced using dissimilar systems and on differe

Explain evolutionary development model, Evolutionary Development model. ...

Evolutionary Development model.  Evolutionary Development Model : Evolutionary development model resembles iterative enhancement model. The similar phases as defined for the w

What are the properties of srs, What are the properties of SRS? i. Corr...

What are the properties of SRS? i. Correct - The SRS must be built up to date while  appropriate requirements are identified. ii. Unambiguous - When the requirements are pro

Explain the persistent class maps to one relational table, Explain the pers...

Explain the persistent class maps to one relational table In most of cases, persistent class maps to one relational table (keeping aside inheritance issue, for the moment). In

What is grey box testing, Grey box testing is a software testing method tha...

Grey box testing is a software testing method that uses a combination of black box testing and white box testing. Gray box testing is not the black box testing, because the tester

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd