WELDER PERFORMANCE QUALIFICATIONS


Requirement of Welder Qualification

In performance qualification, the basic attempt is to establish the ability of the welder to deposit sound metal. In case of welding operator qualification it is his mechanical ability to operate the welding machine that is tested and acknowledged.

During welder's qualification, only the essential variables (as applicable to welder's skill) are considered and production welds with such altered variables should not be continued without additionally qualifying the welders. A welding machine operator usually gets qualified along with procedure test. Additional qualifications are to be suitably enforced as and when certain essential variables are not meeting.

Codes for Performance Qualifications and Acceptance of Defects


A large number of industrial codes now a days recognise prequalified welding procedures as t he manufacturing firms are able to produce the documentary evidence for such procedures as in vogue in their organisations. The selection, training and qualification of welders are the next few steps. Some of the popular codes to look for, at this juncture are:

  • Indian Boiler Regulations - IBR
  • ASME Boiler and Pressure Vessel Code - Section IX (Welding, Brazing & Soldering Qualifications)
  • DIN 8560 - (Testing of Welders)
  • BS 4872 - (Approval Testing of Welders when welding procedure approval is not required.
  • ISO
  • EN

 


There are also number of other specifications for welder testing, pertaining to individual codes of construction. A welder's plate test coupon can be maximum 300 mm x 400 mm with appropriate thickness to cover the allowed, specified thickness ranges. Similarly 2 pipes (or tubes) having a maximum of 125 mm length each are joined together for a pipe weld test coupon.

The test coupons are then subjected to radiography testing. Welders are outrightly failed for the following indications in the radiographic film. All other defects are acceptable within limits.

1. Severe root porosites / blow holes
2. Cluster of porosites
3. Cracks
4. Lack of fusion / incomplete penetration

After necessary post weld heat treatment the plates or pipes are marked, stamped, cut and machined into mechanical test specimens. Though, the requirements of the codes are slightly varied, 2 face bend tests and 2 root bend t ests alone are conducted for performance qualifications. In lieu of the above a radiographic evaluation is done.


Related Discussions:- Welder performance qualifications

Joint preparation and identification, The joint bevels shall be prepared in...

The joint bevels shall be prepared in accordance with the registered and approved weld procedure. Internal and external surfaces to be welded shall be clean and free from paint, o

Determine the tension in the cord, Determine the tension in the cord: ...

Determine the tension in the cord: Two blocks containing the weights and positions illustrated in Figure rest on a frame which rotates around its vertical axis at a constant s

Mechanics, assumptions made in parallelogram law of forces

assumptions made in parallelogram law of forces

What are the limitations with rectangular combined footings, What are the l...

What are the limitations with rectangular combined footings? In this section the analysis is limited to the determination of plan dimensions of the footing. The physical dimens

External coatings on vessels, Q. External coatings on vessels? All pres...

Q. External coatings on vessels? All pressure vessels that will be installed underground shall have an external coating applied according to the following procedure: • All e

Desalination techniques of water using different memberanes, explicate desa...

explicate desalinationm techniques of water by using different memberanes

Steps for solving problem for finding maximum power, Step s for Solving Pr...

Step s for Solving Problem for Finding Maximum Power: 1. Use formula stress (σ) = force (Maximum Tension)/Area Where;  Area = b.t that is, T max = σ.b.t 2. Unit mass (

Estimate elapsed time and height , Phase 1 Initially ALL Valves A, B, C...

Phase 1 Initially ALL Valves A, B, C, D, E and F are closed.  ALL Tanks A, B, C, D, E are separated and each sealed from the atmosphere. Tank E initially has 2' of air @

Find the horizontal hydrostatic force, Question. In the system shown below...

Question. In the system shown below, the force exerted by the free jet issuing from the sharp-edged circular nozzle and impinging on the small circular plate is just su±cient to k

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd