WBM Road, Civil Engineering

Assignment Help:
if the WBM Road is constructed with 80mm , 40mm metal what will be the depreciation factor per year, how much thickness of the layer will be reduced per year due to trafic and rainy season

Related Discussions:- WBM Road

Fluid mechanics, How a water bound macadam road is maintained

How a water bound macadam road is maintained

Aggregates, list the properties of aggregates

list the properties of aggregates

Determine the maximum pressure at the base of the wall, A masonry retaining...

A masonry retaining wall of trapezoidal section with the vertical face on the earth side is 1.5 m wide at the top and 3.5 m wide at the base and is 5.0 m high. It retains a sand fi

Human values, give the two aspects of honesty& explain

give the two aspects of honesty& explain

..zero energy building, this is our final year project .please help me to g...

this is our final year project .please help me to guide about it

Write definition of afflux and skew bridge, Write definition of the followi...

Write definition of the following - (i) Afflux. ( ii ) Free Board. ( iii ) Clearance. ( iv ) Via duct. ( v ) Skew Bridge ( vi ) Cause Way. ( vii ) Clear Span. ( v

Explain the influence line-moment, Influence line-moment 1.  Replace th...

Influence line-moment 1.  Replace the point of interest with an imaginary hinge. 2.  Rotate the beam one unit rotation by apply equal but opposite moments to each of the two

. determine the permeability of the aquifer, An unconfined aquifer is calle...

An unconfined aquifer is called to be 32 m thick below the water table. A constant discharge of 2 cubic metres per minute is pumped out of the aquifer by a tubewell till the water

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd