Please answer the follwing question .

Specs: Filteration Capacity 18000 LPH , Tested pressure 6Kg/Sq.cm, Vertical MS pressure Sand filter(flat ends 6mm thick & dished ends 8mm thick).

Question: How to calculate weight of Mild Steel Vessel ? Please explain with suitable formula .


Thanks & Regards

Related Discussions:- Water

Burners - aircraft engine , BURNERS :  ATOMISER BURNERS This ...

BURNERS :  ATOMISER BURNERS This type of burner presents the fuel in a finely atomised spray by forcing the fuel to pass through a small orifice. The size of the orifi

Combustion chamber injection system - aircraft engine , Combustion chamber ...

Combustion chamber injection system: Injecting a water or water/methanol mixture into the combustion chambers increases the mass flow through the turbine and the high volumetri

Sizing, Q. What is the purpose of :          (i) Sizing,            ...

Q. What is the purpose of :          (i) Sizing,                  (ii) Coining operations in powder metallurgy,         (iii) Infiltration,           (iv) Impregnati

Dischage rate, stuck on a project that requires 5 outputs with 6 inputs and...

stuck on a project that requires 5 outputs with 6 inputs and all formulas

Evacuation of a high rise building - means of escape, Evacuation of a high ...

Evacuation of a high rise building - means of escape: Evacuation of a high rise building is likely to be split into two or more phases.  Initially, when the alarm activates (f

Assignment, Real time processing is suitable when it is necesssary to have ...

Real time processing is suitable when it is necesssary to have the latest information in the following types of business operations

Guides for the fire risk assessment, Guides for the fire risk assessment: ...

Guides for the fire risk assessment: In the UK, the Government produce guides for the FRA process that are free to download.   There are a range of guides covering  the ran

modified internal rate of return mirr, MODIFIED INTERNAL RATE OF RETURN (M...

MODIFIED INTERNAL RATE OF RETURN (MIRR) This method is a financial analysis to rank alternative investment projects of equal size. This method is modification of internal rate of r

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd