Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
1. Where permanent bench of india located ? 2. use of Permanent BenchMark ?
Stabilised Pavement Layers: Soil stabilisation is the process of treating a soil in such a manner as to alter and improve its properties for use as a pavement layer on sub-gr
difination of magnative bearing
how to set out&excavate steps
Q. Full bore flow in drainage design? In the design of gravity drainage pipes, full bore flow capacity is usually adopted to check against design runoff. Though one should note
what is the difference between feasibility study and traffic counting
Explain Chezy Manning Equation v = 1.49/n (R) 0.67 (S) 0.5 R = hydraulic radius (ft) = Area/ wetted perimeter, R = D/4 for circular channels full and one-half full
Classification of Bricks Based on their Quality The bricks used in construction are classified as following: First class bricks Second class bricks Third class bric
Question During piling works, normally founding levels of bored piles are definite by using total core recovery or rock quality designation (RQD). Are there any problems by
Test for determination of Shear Modulus Conditioning load : Bearings shall be preloaded with maximum horizontal load Htest (with Ntest or vertical load held constant) and un
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd