Vibrocoring in marine ground investigation
If only shallow marine ground geotechnical information is essential for design purpose, vibrocoring is certainly a good choice for sampling disturbed samples. In vibrocoring a core barrel and an inner liner generally of 100mm diameter and 6m long are vibrated into the seabed.
Because the installation of vibrocoring includes the vibration of barrels there is considerable disturbance of recovered samples. Vibrocoring has the merit of fast speed of sample recovery (for instance up to 14 cores can be obtained in one day). Furthermore the cost of vibrocoring operation is low when compared with other viable marine geotechnical investigation options.
Define Wastewater treatment Processes The wastewater treatment processes that we design mimic the processes that occur in the nature (for example processes that occur in a flow
Q. Diffrence between Single and double-cell box culvert? The usage of double-cell box culverts is preferred to single-cell box culverts for cross-sectional area larger than abo
Question In structure of pump troughs for accommodation of screw pumps, what is major construction process to ensure close contact between screw pumps and pump trough ? An
Illustrate by mean of single line drawing the difference between couple truss and couple close truss
Explain Coagulation Surface waters must be treated to remove turbidity, color and bacteria The traditional sand filtration is not sufficient in removing bacteria, viru
Where to overlap rcc column
Autocad-Introduction Learning to use a CAD system is similar to learning a new language. It is necessary tobegin with the basic alphabet and learn how to use it correctly and
What is Initial Prestress From the transfer stage, tensile stresses in tendons apply compressive stresses in concrete. The initial value of these stresses (in tendons or in co
Discuss about the term - End Zone It is the length of a post-tensioned concrete member, at the end, which is required to get a distribution of prestress over the whole of the c
Geotechnical project specifications require that the soil's optimum moisture content of 24% be maintained during the roadbed's construction. The field moisture test finds that fi
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd