Verify the total active thrust on the wall per lineal metre, Civil Engineering

Assignment Help:

A smooth backed vertical wall is 6.3 m high and retains a soil with a bulk unit weight of 18 kN/m3 and φ = 18°. The top of the soil is level with the top of the wall and is horizontal. If the soil surface carries a uniformly distributed load of 4.5 kN/m2, verify the total active thrust on the wall per lineal metre of the wall and its point of application

 


Related Discussions:- Verify the total active thrust on the wall per lineal metre

Application of quadratic equation, list some applications of quadratic equa...

list some applications of quadratic equation in civil engineering

LOADS, what are the difference between UDL and UVL?

what are the difference between UDL and UVL?

The material that have lowest resistivity is , The material that have lowes...

The material that have lowest resistivity is Answer: Silver is the material

How do we calculate absolute pressure, Absolute is equivalent to gauge pres...

Absolute is equivalent to gauge pressure plus atmospheric.

Describe principles of river protection works, Q. Describe Principles of ri...

Q. Describe Principles of river protection works? Determination of design discharge for a bridge is sometimes required to be based on flood marks left during unprecedented abno

Influence lines for cantilever beam, fine the influence line for cantilever...

fine the influence line for cantilever beam of span 7 m and load at 2 m?

Engineering survey, With respect to implementation of Civil Engineering pro...

With respect to implementation of Civil Engineering projects explain the relevance of application of the principle of ''Working from Whole to Part''

Minimum and maximum distance between bars, Q. Minimum and maximum distance ...

Q. Minimum and maximum distance between bars? Minimum distance between bars and maximum distance between bars In some codes, a minimum distance amid bars is specified to

Indicate quality of rock foundation, Question During piling works, norm...

Question During piling works, normally founding levels of bored piles are definite by using total core recovery or rock quality designation (RQD). Are there any problems by

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd