Uses of cement, Civil Engineering

Assignment Help:

Uses of Cement

Cement is utilized widely for the construction of several structures. Some of them are listed below:

(i) Cement slurry is utilized for filling cracks in concrete structures.

(ii) Cement mortar is utilized for masonry work, plastering and pointing.

(iii) Cement concrete is utilized for the construction of several structures like buildings, bridges, tunnels, Water tanks docks, harbors etc.

(iv) Cement is utilized to manufacture lamp posts, railway sleepers, telephone posts, piles etc.

(v) For manufacturing garden seats, cement pipes, dust bins, flower pots etc. cement is generally used.

(vi) It is useful for the construction of roads, courts, footpaths, for several sports etc.


Related Discussions:- Uses of cement

Heliports and stol ports, Heliports and Stol Ports: Heliports ...

Heliports and Stol Ports: Heliports Heliports are facilities for landing and take-off of helicopters. They consist of : (a) Landing and take-off area, which contai

Disparity between fasteners, Question What is major disparity between ...

Question What is major disparity between fasteners , bolts and screws ? Answer Fastener is a broad term to explain something that is used as a restraint for holding

Determine the ground elevation, The trigonometric levelling from the survey...

The trigonometric levelling from the surveyor's notes is shown below. The ground elevation of T (ft) is most nearly: Solution:  The elevation of point P can be found from: E

Structures, What is the economic span of a bridge

What is the economic span of a bridge

#title difference, Write difference between the working stress method and l...

Write difference between the working stress method and limit step methode

Tension member, Explain various forms of tension members.

Explain various forms of tension members.

Length is constructed in first phase of construction, In construction of a ...

In construction of a two-span bridge (span length = L) by using span-by-span construction, why is the length of about 1.25L bridge segment is constructed in first phase of construc

Highway Engineering, I am a Civil Engg student. Why CBR Values determined ...

I am a Civil Engg student. Why CBR Values determined only at 2.5 and 5 mm penetration ?.

Determine the late start time for activity, For the project network shown, ...

For the project network shown, the late start time (day) for activity "Q" is most nearly: Solution:  List the paths leading to "Q" and calculate the duration for each.

Sewer, what are the procedure of surveying for sewer projects/

what are the procedure of surveying for sewer projects/

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd