Aviation legislation - SUPPLEMENTAL TYPE CERTIFICATION, Applied Statistics

Assignment Help:

JAR 21 SUPPLEMENTAL TYPE CERTIFICATION

JAR 21 Part E introduces the need for Supplemental Type Certification when a manufacturer wishes to make major changes to the Type Design of an aircraft. 

CHANGES TO TYPE CERTIFICATES

Changes in Type Design are classified as minor and major.  A "minor change" is one that has no appreciable effect on the weight, balance, structural strength, reliability, operational characteristics, or other characteristics affecting the airworthiness of the product.  All other changes are "major changes". 

All changes (major and minor) must be approved in accordance with JAR 21 as appropriate, and must be adequately identified. 

Eligibility

a) The Authority will only accept an application for approval of a major change to a Type Design from the Type Certificate holder;  all other applicants for a major change to a Type Design must apply under Supplemental Type Certification (STC).

(b) Any person may apply for approval of a minor change to a Type Design. 

Application

An application for approval of a change to a Type Design must be made in a form and manner acceptable to the Authority and must include: 

a) A description of the change identifying

1. All parts of the Type Design and the approved Manuals affected by the change, and: 

2. The requirements with which the change has been designed to comply in accordance and JAR 21. 

b) Identification of any re-investigations necessary to show compliance of the changed product with the applicable requirements. 

Minor Changes

Minor changes in a Type Design may be classified and approved either

a) Directly by the Authority;  or

b) Indirectly, through the use, by an appropriately approved design organisation, of modification procedures that have been agreed with the Authority. 

Major Changes

a) An applicant for approval of a major change must

3. Submit to the Authority substantiating data together with any necessary descriptive data for inclusion in the Type Design; 

4. Show that the changed product complies with applicable requirements, as specified in JAR 21. 

5. Declare that he has shown compliance with applicable requirements and must provide to the Authority the basis on which such a declaration is made;  and

6. Comply with JAR 21.

b) Approval of a major change in a Type Design is limited to that (those) specific configuration(s) in the Type Design upon which the change is made. 


Related Discussions:- Aviation legislation - SUPPLEMENTAL TYPE CERTIFICATION

Weighted arithmetic mean, Weighted Arithmetic Mean Another aspect...

Weighted Arithmetic Mean Another aspect to be considered is the importance we assign to each observation. The arithmetic mean as we calculated it so far gives equal

Determine relative frequency, A sample of college students and a separate s...

A sample of college students and a separate sample of adults aged 30-59 were surveyed regarding the amount of fruit they eat each day.  The results are shown in the histograms belo

Probability and expectation, Ten balls are put in 6 slots at random.Then ex...

Ten balls are put in 6 slots at random.Then expected total number of balls in the two extreme slots

Descriptive Statistics, To determine the proportion of people in your town ...

To determine the proportion of people in your town who are smokers, it has been decided to poll people at one of the following local spots: (a) the pool hall; (b) the bowling alley

Prediction, Differentiate between prediction, projection and forecasting.

Differentiate between prediction, projection and forecasting.

Its a portfolio assignment, i m doing MBA in singapore and i want a good wo...

i m doing MBA in singapore and i want a good work. i want a data for 200 observations and then answers for some questions. and i need the data to be approved by our professor first

Inference on reggression analysis, find the expected value of the mean squa...

find the expected value of the mean square error and of the mean square reggression

Data project, Dr. Jim Mirabella UNIT EIGHT: DATA ANALYSIS PROJECT All Excel...

Dr. Jim Mirabella UNIT EIGHT: DATA ANALYSIS PROJECT All Excel output should be copied into a single Word document where you must enter all of your responses to the questions below.

Statistics to support learning, Scenario: Many of the years 5 and year 6 l...

Scenario: Many of the years 5 and year 6 learners' at Woodlands Park School were excited about being chosen for the cross-country team.  Every day, they were able to run laps of t

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd