Question
Under which situation ought to engineers use pot bearings instead of elastomeric bearings?
Answer
In an event of high vertical loads shared with large angle of rotations, rubber bearings are undesirable after compared with pot bearings. For example, elastomeric bearings want large bearing surfaces so as to compression know how to be maintained between contact surfaces and bearings and piers. Furthermore, it as well leads to uneven distribution of stress on piers and some of these highly induced stresses might damage the piers. As a result, pot bearings are better alternatives than elastomeric bearings in such a scenario as optional by David J. Lee.
Question In all-purpose Specification for Civil Engineering Works, it details temperature requirements for bituminous material all through and after mixing. What is cause beh
Q. Show the Differences Between GGBS and PFA? The use of GGBS as substitute of cement improves smaller reliance on PFA. Particularly GGBS is supposed to be more compatible with
Pavement Drainage: Water enters the pavement layers through cracks, joints and open spaces in the pavement surface. The water reaches the soil sub-grade on which the pavement
Define Cast iron substructure - Inspection of bridge? Cast Iron also has the problem of corrosion due to atmosphere, which is similar to that of steel. However, in acidic or br
given A,B,C,and D are four plotted points at 2 centimeter apart and their ground reduced levels are 57.5 meter 63.2 meter 68.2 meter and 59.2 respectively.it is required to draw co
calculation of corrected fore bearings and back bearings in
Riveted and Welded Joints: This theory deals with riveted and welded connections. In riveted connections, you have learnt different types of rivet and various parameters perta
A concrete contractor historical records show that the construction duration for a cast-in-place foundation formwork is 1,000-SF/crew-day. Determine the number of days a 200,000-SF
Question While designing reservoirs, indirect tensile strength of the concrete mix is particular to be less than a specific value such as 2.8N/mm2 for potable water. Why ought
what is door and window sizes
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd