Use plain dumb-bell type and center-bulb sort, Civil Engineering

Assignment Help:

Question

While selection of waterstop, shall engineers use plain dumb-bell type , center-bulb sort?


Answer

Plain dumb-bell kind is used for joint site where small movements are anticipated. So, construction joints are desirable sites of this type of waterstop. On other hand, center-bulb type waterstop is appropriate for growth joints or locations anywhere lateral and shear movements happen due to settlement.

 


Related Discussions:- Use plain dumb-bell type and center-bulb sort

Basic things used in road construction, Basic things used in road construct...

Basic things used in road construction: Water Absorption : The quantity of water absorbed by aggregates. Aggregate Impact Value : The percentage by weight of crushed ma

Explain the statements about the critical path method, 1. Determine a netwo...

1. Determine a network diagram method that uses only finish-to-start relationships and may use dummy activities to define logical relationships.  2.  Precedence diagr

Lime, LIME It is significant binding material utilized in building con...

LIME It is significant binding material utilized in building construction. Lime has been utilized as the material of construction from ancient time. While it is mixed with san

Local scour at obstructions in rivers, Q. Local Scour at obstructions in ri...

Q. Local Scour at obstructions in rivers? When the water flow in river is deflected by obstructions such as bridge piers, scouring would occur arising from formation of vortexe

Explain bridge selection criteria - underwater inspection, Explain the Brid...

Explain the Bridge Selection Criteria - Underwater inspection? Various factors influence the bridge selection criteria. As a minimum, all structures must receive routine underw

Functions of different reinforcement in a typical pile cap, Functions of di...

Functions of different reinforcement in a typical pile cap Loads from columns transferring to pile cap persuade tensile forces at the bottom of cap. For example, by using trus

Illustrate the design discharge for foundation, Q. Illustrate the Design di...

Q. Illustrate the Design discharge for foundation? To provide for an adequate margin of safety, the foundation and protective works of a bridge should be designed for a flood d

Explain the limitations of rebound hammer, Explain the Limitations of Rebou...

Explain the Limitations of Rebound Hammer? The following characteristics of concrete can affect the correlation of the rebound number with the actual surface hardness and shoul

Concrete, if the slump of concrete drops how to rectify it

if the slump of concrete drops how to rectify it

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd