Q. Use of PFA and GGBS?

Both PFA and GGBS are by-products of industry and use of them is ecologically friendly. Most significantly, with PFA and GBS adopted as partial replacement of cement, demand for cement will be severely reduced. As the manufacture of one tonne of cement produces about 1 tonne of carbon dioxide, environment could be conserved by using less cement by partial replacement of GGBS andPFA.  

Conversely the use of PFA and GGBS as partial replacement of cement improves long-term durability of concrete in terms of resistance to sulphate attack, chloride attack and alkali-silica reaction. It follows that structure would remain to be serviceable for longer period, leading to substantial cost saving. Apart from consideration of long-term durability, use of GGBS and PFA results in the reduction of heat of hydration so that problem of thermal cracking is greatly decreased. The enhanced control of thermal movement also contributes to better and long-term performance of concrete.

In terms of development of strength, GGBS and PFA shared the common observation of lower initial strength development and higher final concrete strength. Henceforth, designers have to take into account the potential demerit of lower strength development and can make use of merit of higher final concrete strength in design.


Related Discussions:- Use of PFA and GGBS

State the total load which the raft can support, A raft, 8 m × 24 m, is fou...

A raft, 8 m × 24 m, is founded at a depth of 4 m in sand with a value of N = 20 up to great depth. Illustrate the total load which the raft can support? What will be the total c

Mass effect, how the effective mass of charge carrier less than the rest ma...

how the effective mass of charge carrier less than the rest mass

State the problem and phases of site investigation, State the Problem and p...

State the Problem and phases of site investigation The site investigation is to be performed to obtain the solution for the following problems: i)  Foundation problems ii

Calculate the parameters for setting out curve, Q For a curve of 50, apex ...

Q For a curve of 50, apex angle of 900 and transition length of 60m, calculate the parameters for setting out curve by a Theodolite for TTP, mid point of transition, CTP and a p

Explain the hydraulic gradient, Explain the Hydraulic Gradient A measur...

Explain the Hydraulic Gradient A measurement of the movement of water over distances. Change in hydraulic head from one monitoring point to another.  i = ΔH/L  units are typ

Sea breeze and land breeze, Explain the following: (a) Sea breeze and L...

Explain the following: (a) Sea breeze and Land breeze (b) What is Thermal comfort (c) What is Global wind pattern and Coriolis effect (d) How wind affects the tempe

What do you mean by distressing, Q. What do you mean by Distressing? Di...

Q. What do you mean by Distressing? Distressing is the operation under taken with or with out rail tensors to secure stress free condition in the LWR at a desired rail temperat

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd