Upper bound of indirect tensile strength, Civil Engineering

Assignment Help:

Question

While designing reservoirs, indirect tensile strength of the concrete mix is particular to be less than a specific value such as 2.8N/mm2 for potable water. Why ought to engineers put an upper bound of indirect tensile strength?

 

Answer

Crack width formation is dependent on early tensile power of concrete. Principle of critical steel ratio too applies in the situation. Amount of reinforcement necessary to control early thermal and reduction movement is determined by capability of reinforcement to induce cracks on concrete structures. If a higher limit is set on the early tensile force of undeveloped concrete, then a choice of tiny cracks will be formed by failing in concrete tension. But, if strength of reinforcement is lower than undeveloped concrete, then subsequent yielding of reinforcement will create isolated and wide cracks that are undesirable for water-retaining structures. So, in order to control formation of such broad crack widths, concrete mix is specified to have a not direct tensile power at seven days not exceeding a sure value

 


Related Discussions:- Upper bound of indirect tensile strength

Doors and windows, what are the actuall windows and door dimensions e.g AN ...

what are the actuall windows and door dimensions e.g AN ND4

Define categories of spalls -underwater inspection of bridge, Define catego...

Define categories of Spalls -underwater inspection of bridge? Spalls are classified as follows:  i. Small spalls - up to 25 mm deep or approximately 150 mm in diameter. i

Trigonometry, #question a pilot entering a bay on course 60.3 degrees at sp...

#question a pilot entering a bay on course 60.3 degrees at speed 12 miles per hour sees a light bearing 37.3 true and 20 minutes later he sees it bearing 20.0 degrees true. if he k

Briefly explain about artificial cut offs, Q. Briefly explain about Artific...

Q. Briefly explain about Artificial cut offs? Alignment of a cut off is chosen so that approach and exit ends remain more or less tangential to the river course. A cut off can

Explain the aashto classification system, Explain the AASHTO Classification...

Explain the AASHTO Classification System   1.  Identify the percent passing the No.10, No. 40, and No. 200 sieves. Identify the LL and PI of the fraction passing the No. 40 sie

Steel overlap in columns, where we can overlap steel in columns if we use ...

where we can overlap steel in columns if we use 50 or 60 bar diameter as overlap length.

Segmentally lined and sprayed concrete linings tunnels, Q. Segmentally line...

Q. Segmentally lined and Sprayed Concrete Linings tunnels? The fundamental difference between segmentally lined tunnels and SCL tunnels is that the sprayed concrete in SCL tunn

3 wire leveling, can you give me some examples and problems in 3-wire level...

can you give me some examples and problems in 3-wire leveling?

Installation of band drains, Question For drained reclamation, what wil...

Question For drained reclamation, what will significance of smear zone bring by installation of band drains ? Answer Throughout installation of band drains, smear zon

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd