Univariate normal distribution, Civil Engineering

Assignment Help:

Univariate normal distribution:

Let X = (XI, X2, ..., Xn,) has the multivariate normal distribution (5.26) of Section 5.4. Show that Y = a X ' follows a univariate normal distribution where a = ( a1 a2 ..., an, ). Also find the mean and the variance of Y.

Solution:

We have

My(t)= E (etY)= E(etaX') = E(eτX')

where τ = ta = (ta1, ta2,..., tan ).

From Example 3 of Section 5.4, we have

MX (t) = E(e tX') = e τμ' +1/2(t∑ t')

Hence

My(t) = MX(τ) = eτμ' - ½ (τ∑τ') =e t(a μ')-1/2 t2(a∑a')

=e tμ -1/2 t2 σ2

Where

1083_Univariate normal distribution.png

842_Univariate normal distribution3.png

Hence

MX(t) = e tμ+1/2 (t2σ2)

in other words Y - N ( μ, σ2 ) where

682_Univariate normal distribution2.png

842_Univariate normal distribution3.png


Related Discussions:- Univariate normal distribution

Streams not wholly alluvial - alluvial streams, Streams Not Wholly Alluvial...

Streams Not Wholly Alluvial In streams which are not wholly alluvial, consisting of bed of pebbles, rock, etc. the liner waterway is kept equal to the actual surface width of

Increasing concrete cover beyond contractual, Question If contractor sugges...

Question If contractor suggests increasing concrete cover beyond contractual such as 40mm to 70mm shall engineers accept suggestion? Answer In contractual part, based on requir

Advantages of continuous multiple-span deck, Q. Advantages of continuous mu...

Q. Advantages of continuous multiple-span deck over simply supported multiple-span deck? Movement joints are generally added to bridge structures to accommodate movements bec

Telecommunication, Blocked process list is not maintioned in priority order...

Blocked process list is not maintioned in priority order why

Verify the coefficient of elastic uniform compression, Verify the coefficie...

Verify the coefficient of elastic uniform compression if a vibration test on a concrete block of 1 m cube gave a resonant frequency of 36 Hz in vertical vibration. The weight of

Analysis of the two stage construction, A County is planning to build a new...

A County is planning to build a new roadway connector in the rapidly developing area of the county. The road can be built at a reduced capacity now for $30 million and can be widen

Design of flexible pavements - road pavements, Design of Flexible Pavements...

Design of Flexible Pavements: The design of flexible pavements is done by the CBR method. The CBR test, described further, gives an indication of the supporting power of the

Define npdes sampling requirements, Define NPDES Sampling Requirements? ...

Define NPDES Sampling Requirements? The sampling needs under NPDES are given at 40 CFR Part 122, as part of the needs for applying for an NPDES discharge allow. The needs are b

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd