Each physical homogeneous type (solid, liquid orvapour) is a phase. Two or three phases may coexist. e.g. Ice and water at 0 o C. Mixtures of gases (e.g. Air) can only be
What is compacting factor
Explain with lime soda process?cold lime soda process&hot lime soda process and it''s equations?
Question For a l ong slender structure similar to beams, propping is compulsory after elimination of formwork with reasons? Answer After concreting, time at which arresting of
give the two aspects of honesty& explain
Explain the Design Criteria Sedimentation basin Surface Loading rate (or overflow rate), Vo = Q/A (flow rate/surface area) Detention time t or ? = V/Q (Volume /Flow rate)
Question While precast concrete jacking pipes , from time to time grout holes are calculated inside these precast pipes. Give specific and key reasons? Answer Grout h
Define Hand Tools for Underwater Inspection of Bridge? Hand tools involve scrapers, wire brushes, chain and wire ropes. Tools of this kind are suited in which cleaning is confi
What is the safe bearing capacity of a rectangular footing, 1 m × 2 m, placed at a depth of 2 m in an saturated clay having unit weight of 20 kN/m 3 and unconfined compression str
Q. Function of prime coat in bituminous pavement? The main function of prime coat in bituminous pavement is to protect the subgrade from weathering andmoisture. Because the pre
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd