Types of Surveys and Investigations:
For preparing a good road project, the following surveys and investigations are needed:
(a) Traffic Surveys
(b) Topographical Surveys
(c) Drainage Studies
(d) Soil Surveys
(e) Pavement Investigations
Of these, soil surveys will be dealt with in Unit 3, and Pavement Investigations will be dealt with in further.
Ask quA contractor has both a 3-cy and a 5-cy shovel in the equipment fleet. Select the minimum size shovel that will excavate 450,000 bcy of common earth in a minimum of 120 worki
Incoming water contains 2.5 mg/L as a substance of natural alkalinity (HCO3-). The flow rate is 9.5 ML/day). (a) What feed rate is required if the alum dose is 7 mg/L and is avail
Question Comparing speed of "Formwork exceeding 300mm wide, horizontal and at any inclination up to and including 5o to horizontal" with speed of "Formwork exceeding 300mm wide, at
What is Polymer Concrete?
A continuous footing of width 2.5 m rests 1.5 m below the ground surface in clay. The unconfined compressive strength of the clay is 150 kN/m 2 . Measure the ultimate bearing ca
Ask question Design the pavement by group index method for heavy traffic using following subgrade data Soil passing 75micron sieve =65%,liquid limit =40%plastic limit =20% #Min
Reasons of common occurrence of "inadequate pile founding level" in piles of piers The most severe load on piers usually is the horizontal load owing to berthing and mooring o
explain the concept of time dilation on the basis of lorentz transfarmation equations
A saturated clay layer 4 m thick is located 6 m below GL. The void ratio of the clay is 1.0. When a raft foundation is located at 2 m below GL, the stresses at the top and bottom o
Enumerate about the Bonded Member It is a concrete member in which tendons are bonded to the concrete. They may be directly bonded to the concrete as in the case of pre-tension
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd